Updated 5 November 2026. We read the Tamil Nadu Gazette notification of 19 December 2025, DT Next's reports on the 2023 change, the RERA Act's carpet-area definition, the CBIC's GST FAQs and a 2024 law-firm note on the Apartment Ownership Act. Patta for flats is covered separately: Patta for Flats in Tamil Nadu: Joint Patta and UDS Explained.

Carpet, built-up and super built-up area

  • Carpet area (legal): the net usable floor area of the flat, excluding external walls, service shafts, exclusive balconies, verandahs and open terraces, but including internal partition walls (Section 2(k), RERA Act).
  • Super built-up area (market): carpet plus walls plus a share of lobbies, lifts, staircases and amenities. It is not defined in the Act. Consultancy price data are often quoted on it; ANAROCK, for example, states its quoted base prices are on super built-up area.
  • What to do: ask for the price per sq ft of carpet area and the total price in the agreement for sale. A ₹7,250 per sq ft super built-up rate on a flat with 25% loading is about ₹9,667 per sq ft of carpet (our arithmetic).
  • Common question: whether clubhouse, infrastructure or maintenance charges may be levied per sq ft of super built-up area. The Act does not set those rates; what binds is what the registered agreement for sale says, so make every per-sq-ft charge and its area basis explicit before you sign.

UDS: your share of the land

Under the Tamil Nadu Apartment Ownership Act, 2022, in force from 6 March 2024, each owner's undivided share in the land and common areas is in proportion to the carpet area of that flat; the Rules followed on 24 September 2024 (JSA Advocates, 7 October 2024).

Illustration, our arithmetic: a building with 90,000 sq ft of total carpet area on 40,000 sq ft of land. A 900 sq ft carpet flat has 1% of the carpet, so its UDS is 1% of the land, or 400 sq ft. Check the UDS figure in your sale deed against this ratio.

Registration: what a first sale and a resale pay

  • First sale from a builder, since 1 December 2023: one sale deed covering flat and UDS on a composite value fixed by the government, not by the buyer (DT Next, 24 November and 1 December 2023).
  • Stamp and transfer duty on that first sale: 4% up to ₹50 lakh; 5% from ₹50 lakh to ₹3 crore (DT Next, 1 December 2023). The concession applies only to a first sale of a flat conveyed with its proportionate UDS. For values above ₹3 crore, confirm the rate with the sub-registrar.
  • Registration fee: cut from 4% to 2% for sale deeds from 1 April 2023 in the 2023-24 budget (King Stubb & Kasiva, 29 March 2023). Some 2026 guides still print 4% (Square Yards, updated 20 August 2026). Confirm on TNREGINET before you budget.
  • Old-system buyers: if you registered a construction agreement on or before 30 November 2023 and a composite deed on or after 1 December 2023, the duty and fee already paid on the construction agreement are deducted (G.O. Ms. No. 166, Tamil Nadu Gazette, 19 December 2025).
  • Resale: 5% stamp duty plus 2% transfer duty plus the registration fee, on the higher of price and guideline value (King Stubb & Kasiva, 2023). Guideline values: Chennai guideline values.

GST: when it applies

GST applies to construction sold before completion. It does not apply where the entire consideration is received after the completion certificate or first occupation, whichever is earlier (Schedule II, paragraph 5(b), CGST Act, as quoted in Gujarat Advance Ruling No. GUJ/GAAR/R/26/2020, 2 July 2020).

Rates since 1 April 2019: 5% without input tax credit for flats outside the affordable category, and 1% for affordable flats, meaning up to 60 sq m carpet in metro cities including Chennai and a gross amount up to ₹45 lakh. The rate already builds in a one-third deduction for land (CBIC FAQs, 7 May 2019).

Worked example: an ₹87 lakh flat

Our arithmetic. 1,200 sq ft super built-up at ₹7,250 per sq ft (ANAROCK's Chennai average for Q2 2026, as reported by Upstox) = ₹87 lakh. We assume the government's composite value equals the price; it may not.

  • Under construction, paid in stages before completion: GST 5% = ₹4.35 lakh; duty 5% = ₹4.35 lakh; registration 2% = ₹1.74 lakh. Total about ₹97.4 lakh.
  • Completed flat, whole price paid after the completion certificate: no GST; duty ₹4.35 lakh; registration ₹1.74 lakh. Total about ₹93.1 lakh.
  • If the registration fee were 4%: add ₹1.74 lakh to each case.
  • Not included: car park, corpus and maintenance deposits, legal fees and loan charges. Get each in writing. Calculator: Chennai stamp duty calculator.