Before you pay a booking amount on a Gurgaon project, check five papers: the HRERA registration, the DTCP licence, the sanctioned building plan, the occupation certificate (OC) and the completion certificate (CC). A new launch should already show the first three. The OC and CC come at the end, so on a new launch you will not see them. On a ready home, insist on them.
Updated 3 November 2026. We opened haryanarera.gov.in and tcpharyana.gov.in today to see where each record sits. The guides that rank for this search list these papers, but none we read points to the OC and CC records on HRERA or TCP. This is the one-page version. For more depth, see DTCP Licensed vs Unlicensed Colonies in Gurgaon: How to Verify a Builder & Project Before You Buy on licences and How to Check if a Project is RERA Registered in Gurgaon (Haryana RERA Guide 2026) on RERA.
What papers should I check before paying a booking amount?
- HRERA registration: find it in the Registered Projects list for Gurugram. Check the Registration Up-to date.
- DTCP licence: find it in the TCP licence list. Check the status, developer, sectors and Valid/Renewal Upto date.
- Building plan: Form BR-III. Check the memo number, date and validity.
- OC: ready homes only. Check that it covers your tower or floor.
- CC: Form LC-IX for the colony. Ready or older projects only.
Shortlisting first? Start at New Launches, Gurgaon or a corridor such as Dwarka Expressway, Gurgaon, Golf Course Extension Road, Gurgaon, Southern Peripheral Road, Gurgaon or Sohna Road, Gurgaon, then run these checks on the project you like.
How do I check HRERA registration?
- Open haryanarera.gov.in and choose HRERA Gurugram
- Open Registered Projects at haryanarera.gov.in/admincontrol/registered_projects/2. It showed 1,085 entries on 3 November 2026, and its search box filters the list by what you type, such as a project or builder name.
- Read the row: Registration Up-to, View Certificate, View Quarterly Progress and View OC/CC/PCC
- Open Details of Project (Form A-H). Part B gives the licence number and whether the applicant owns the licence. Part C gives the building plan date. Part E lists statutory approvals. Uploaded documents sit at the end.
- Check the two separate lists on the same menu: Lapsed Projects, and Defaulter/Cancelled/Suspended/Abeyance Projects
Many guides say you can search by project name. The Search Projects form does not offer that. It asks for the authority (choose RERA-GRG), project number and year, plus a captcha. HRERA rows carry two numbers: a project ID such as RERA-GRG-nnn-yyyy and a longer certificate number. The form's fields appear to match the project ID. If you only have a name, use the Registered Projects search box.
How do I check the DTCP licence?
- Go to tcpharyana.gov.in/license.htm
- Open “List of All Licenses Granted Along with their BR-III, OC, Completion and Land Schedule”
- Filter by status (VALID, Cancelled, Migrated or DeLicense), district (Gurugram) and purpose, such as Residential Group Housing. The plan area appears as GURGAON-MANESAR.
- Match the License No, Developer Name, Sector Covered, Area and Valid/Renewal Upto with Part B of the HRERA form
Many older rows show a validity date in the past, and the page does not explain them. Ask the seller for the latest renewal order, not just the original licence. The town-wise list is a useful second route: on 3 November 2026 the Gurugram circle showed 326 group housing and 77 plotted colonies. The full matching method is at How to Verify a DTCP Licence and HRERA Registration in Gurgaon, Step by Step.
Where do I find the building plan approval?
A sanction is issued in Form BR-III, with a memo number and date. In the TCP licence list, the BR-III (BP sanction Letter) column holds dated PDFs in the colony's header row, not on each licence row. HRERA's Form A-H gives the approval date too.
TCP also has a “List of Building Plan Approval for last two years”, but the page we opened covered industrial and commercial plots only, with 141 records. A housing project missing from it tells you nothing.
Check the date. Under the Building Code, a sanction lasts two years for buildings under 15 metres and five years for multi-storey buildings. The unfinished part lapses unless the plan is revalidated. Then compare the plan with the brochure: towers, floors and homes per floor.
What is the difference between an OC and a CC in Haryana?
The OC is permission to occupy a building. The RERA Act defines it as permitting occupation of a building with civic infrastructure such as water, sanitation and electricity. Under the Building Code, water, sewer and electricity connections for a high-risk building are released only after the OC.
The CC in TCP's records is usually Form LC-IX, a part or full completion certificate for the colony. Rule 16 of the 1976 Rules allows it once the colony is laid out to approved plans and development works are done. It also starts the coloniser's five-year upkeep period for roads, parks and services.
So an LC-IX is about the colony, and an OC is about a building. The Code also has a building-level completion certificate, Form BRS-IV, signed by the architect and filed with the OC application. When a seller says “CC”, ask which one. PCC on HRERA means part completion.
What changed in the OC rules?
A memo of 8 December 2025 rewrote the OC process, and it is in the Code as amended to 13 August 2026:
- High-risk buildings, which include group housing towers: an empanelled third-party architect with at least five years' experience decides in Form BRS-VII within 18 days. If nothing is heard, the competent authority decides within a further 18 days.
- Low-risk buildings, which include residential plots up to 16.5 metres: an architect issues the OC under self-certification in Form BRS-V
- Violations found later lead to cancellation of a self-certified OC until they are removed
So an OC issued from December 2025 may not carry the old Form BR-VII label, and the signer may be a private architect. Read who issued it and under which form. How to judge an OC once you hold it is at Occupation and Completion Certificates in Haryana: What to Check Before You Take Possession.
How do I find an OC or CC online?
- On HRERA: use View OC/CC/PCC in the project's row. It opens a small table with the document type, remarks and a View link. On 3 November 2026 this link appeared on 27 of the first 100 rows.
- On TCP: open the licence list or town-wise list and read the OC permission letter and LC-IX columns. The OC column is labelled BR-VII on one list and BR-VI on the other.
- On GMDA: its e-OC page is an application service for land in its controlled area. It is not a public lookup. Other guides describe steps that need an application ID or OTP, which a buyer will not have.
A blank is not proof either way. Ask the seller for the PDF with its memo number, then check that it names your tower or floor. If it still does not add up, write to the issuing authority before you pay.
What should I do before I hand over the money?
- Stay within the limit: under Section 13 of the RERA Act, a promoter cannot take more than 10% of the cost as an advance or application fee without first signing and registering an agreement for sale
- Match the names: the promoter on HRERA, the licensee on TCP and the company on your receipt should be the same, or be linked by a collaboration agreement shown in Part B
- Match the unit: your tower, floor and home should appear in the sanctioned plan and in the registered phase
- Get refund terms in writing, in case any paper does not match
- Stop if there is no registration on the portal, the seller says approval is “applied for”, or a ready home has no OC
Does this change for a builder floor?
Yes. A single-plot floor usually has no HRERA page, because the RERA Act exempts land of up to 500 sq m or up to eight apartments. The licence search still applies to the colony, but your protection is the sanctioned plan, the OC and the deed. Those papers may come from a local body or HSVP, so ask the seller for the originals. In 2026, also read Stilt Plus 4 Floors in Gurgaon: 2026 News and Buyer Checklist. For help choosing the format, see Builder Floor or Apartment in Gurgaon? How to Decide in 2026.
Buying from abroad? The same checks apply, and The NRI Guide to Buying Property in Gurgaon (In Depth) covers the rest. For the investment view, see /investment/gurgaon.