PRR-2 is the southern section of the Bengaluru Business Corridor, a proposed 52 km road linking Mysuru Road and Hosur Road, for which the BDA issued a final notification in September 2026 to acquire 1,427 acres across six hoblis (Urban Acres, 15 October 2026, as reported in our 23 October post). On the Kanakapura Road side, residents of two approved layouts in Kaggalipura, Gardens 4 and Sri Krishna Gardens on survey numbers 112/1 and 112/3, have asked the authorities to reconsider the alignment (Constro Facilitator, 12 October 2026).
Updated 10 November 2026. We could not find a published survey-level alignment map, so this guide gives no distances from the road. It sets out what is notified, what is only PROPOSED, the villages named in each list, and how a plot or flat buyer checks a survey number.
What is notified for PRR-2 so far?
- Road: PRR-2, the 52 km southern Business Corridor between Mysuru Road and Hosur Road (Urban Acres, 15 October 2026).
- Preliminary notification: 12 December 2005 (Constro Facilitator, 12 October 2026).
- Final notification: September 2026, 1,427 acres across six hoblis (Urban Acres). In Kengeri's Agara village, the BDA notified part of Survey No. 115 on 3 September 2026 (Urban Acres, via our 23 October post).
- Court order: the High Court has stayed acquisition and ordered status quo in Machohalli village while it hears landowners; the order is interim (Urban Acres, 17 October 2026). Details: PRR-2 Bengaluru: Kengeri Land Sale, HC Stay and What to Check.
What did the Kaggalipura layout residents ask for?
Constro Facilitator reported on 12 October 2026 that families and site owners in Gardens 4 and Sri Krishna Gardens, approved layouts in Kaggalipura village on Kanakapura Road, found their land in the final notification for PRR-2 (survey numbers 112/1 and 112/3). They asked the authorities to reconsider the alignment so the layouts are not acquired, and said they are not opposed to the road. Deccan Herald carried the same request on 9 October under the headline about Gardens 4 residents seeking exclusion. No official response had been reported when we checked.
Which Kanakapura Road villages are named, and for what?
Two different lists circulate, and they are for different things:
- Road land (notified): survey numbers in the September 2026 final notification. On the Kanakapura side, Kaggalipura survey numbers 112/1 and 112/3 are reported (Constro Facilitator). The full schedule is in the notification itself.
- PROPOSED compensation layouts: in January 2025 the BDA said it planned six new layouts, about 50,000 plots on about 3,000 hectares, to compensate PRR-2 landowners on a 40:60 model, and named nine villages for them: BM Kaval, Gulikamale (Gulakamale), Kaggalipura, OB Choodanahalli, Agara, Uttari, Devagere, Gudimavu and Kambipura Gangasandra. Preliminary notifications for these layouts were then pending (Construction World, 2 January 2025).
- So a village on the second list is not necessarily on the road alignment; it is where the BDA planned layouts. Check the specific survey number against the specific notice.
How to check whether a survey number is notified
- Take the survey number, hissa and extent from the RTC and the sale deed, not the layout name or brochure.
- Read the BDA final notification schedule (and any Gazette copy) for that village; a notice can cover part of a survey number, as in Agara.
- Check the Kaveri 2.0 portal (kaveri.karnataka.gov.in) for notices and court orders on the property, and pull an EC: EC Download Karnataka on Kaveri 2.0: Step-by-Step 2026.
- Do not rely on EC, RTC or khata alone; they may not show an acquisition notice (NammaWard, 31 August 2026, via our 23 October post).
- Look for later court orders on the village, such as the Machohalli status quo.
- Ask the BDA's Business Corridor office in writing if the parcel is near the corridor, and keep the reply.
- Since 9 October 2026 the Gazette lists section 8 of the 1991 land-transfer Act as a ground for refusing registration: Karnataka Registration Refusal Rules 2026: The 22-B Gazette.
RERA-registered flats on Kanakapura Road
A RERA-registered project has plan sanction on land the promoter must hold title to, so flat buyers are less exposed than plot buyers. Still ask whether any part of the site or its approach road is in a PRR schedule. Projects on Property Point's listings, prices checked 10 November 2026; we have no indication any is affected. Project — locality — status — price — K-RERA:
- Azalea at Brigade Meadows — Kaggalipura — New Launch — from ₹1.25 crore — PRM/KA/RERA/1251/310/PR/180826/008875: Azalea at Brigade Meadows
- Sattva Forest Ridge — JP Nagar 9th Phase, Anjanapura — Under Construction — ₹79 lakh–₹2.08 crore — PRM/KA/RERA/1251/310/PR/241224/007315: Sattva Forest Ridge
- Aparna Wonderwoods — Mallasandra, off Kanakapura Road — New Launch — ₹1.34–2.16 crore — PRM/KA/RERA/1251/310/PR/080626/008706: Aparna Wonderwoods
- Casagrand Zaiden — Talaghattapura — Under Construction — ₹67–85 lakh — PRM/KA/RERA/1251/310/PR/120423/005862: Casagrand Zaiden
- All Kanakapura Road homes: Kanakapura Road, Bangalore. Guidance values: Bangalore guidance values.
Which fits whom
Plot buyers in villages off Kanakapura Road carry the most exposure, because a plot is a survey number and the road needs land: check every survey number against the September 2026 schedule before paying an advance. Flat buyers in RERA-registered projects carry less, since the project's land has been through plan sanction; the question for them is the approach road and the timing of the corridor. Buyers who want the corridor as a future link should treat it as a long-term plan until civil work starts on the southern section.
What a buyer should ask the seller
- The survey number, hissa and extent of the land under the plot or project, in writing.
- A written statement that no part of it is in the PRR-2 final notification or any other acquisition schedule.
- Copies of the layout approval and the conversion order, for a plot in a private layout.
- For a flat: whether the approach road or any common area falls in a notified parcel.
- A clause in the sale agreement that lets you withdraw with a full refund if the land turns out to be notified.
Related reading
Our village list and compensation guide for the corridor, the most-read page on the topic: Peripheral Ring Road Bangalore Villages List 2026 (All 61). How PRR compares with STRR and other ring roads: Bangalore Ring Roads Compared: STRR vs PRR vs 134-km Road.


