Phase 1 of Tonino Lamborghini Residences Gurugram in Sector 71 has sold out, and Phase 2, with roughly the same number of homes out of 812 in total, is due "soon" (Construction World, 2 November 2026). The project is registered with HRERA Gurugram as GGM/1056/788/2026/28, dated 8 April 2026, with a completion date of 1 January 2033.
Updated 10 November 2026. We read the sell-out reports, opened the project's HRERA page and its REP-I filing, and searched for a separate Phase 2 registration; we did not find one. Signature Global has not published a Phase 2 price, so this page gives none. It sets out what is registered, how the two phases split and how the project sits against its Sector 71 neighbours.
Tonino Lamborghini Residences at a glance
- Developer: Signature Global, with Italian brand Tonino Lamborghini; the brand's first residential project in India (Construction World, 2 November 2026).
- Location: Sector 71, Southern Peripheral Road (SPR), village Fazilpur Jharsa, Badshahpur tehsil (HRERA project page).
- Land: 12.40 acres; licence 187 of 2025, dated 25 September 2025 (HRERA REP-I).
- Homes: 812 in 3, 4 and 4.5 BHK configurations, five towers of ground plus 41 floors, four homes per core (The Realty Today, 28 October 2026).
- Design: Handel Architects, New York (principal), Bose Brothers Architects (executive), interiors by Carlos Rossi, creative direction by Angela Krieger; "Vertical Village" landscaping and a "Social Ribbon" of shared spaces (Construction World, 2 November 2026).
- Green rating: IGBC Platinum (same source).
- Setting: part of SG SPR Estate, next to a 25-acre business district Signature Global is developing with RMZ (same source).
Is Tonino Lamborghini Residences RERA registered?
Yes. The HRERA Gurugram project page shows approval reference GGM/1056/788/2026/28 dated 8 April 2026, with the certificate uploaded on 17 April 2026 and the portal ID RERA-GRG-2186-2026. Some broker pages quote the portal ID; the certificate number is the GGM one. The same number is printed on the developer's project-site disclaimer.
The REP-I filing gives likely construction start as 1 March 2026 and likely completion as 1 January 2033. Our copy of the register shows the registration valid to the same date. Estimated project cost is ₹2,890.97 crore, of which land is ₹763.30 crore and apartment construction ₹1,504.07 crore. FAR proposed is 2.53 against 2.65 permitted.
Phase 1 vs Phase 2: what is known
Does Phase 2 need its own registration? The REP-I filing lists 812 apartments, which is the two-phase total the developer quotes, so the April 2026 registration appears to cover the whole project. We found no Phase 2-specific number on the register. Before you pay, ask the sales office to show the certificate that covers your tower.
- Phase 1 — status: sold out (Tonino Lamborghini S.p.A. and Signature Global, 28 October 2026) — homes: not disclosed — launched in April 2026 (Construction World, 21 April 2026).
- Phase 2 — status: launching soon, date not given — homes: "approximately the same number" as Phase 1 (The Realty Today, 28 October 2026) — price: not published.
- Both phases — 812 homes, 12.40 acres, five towers of G+41 (same source).
Tonino Lamborghini Residences carpet areas
The filing lists six apartment carpet sizes. It does not say which size is which BHK, and square feet are our conversion (1 sq m = 10.764 sq ft).
- 83.08 sq m (about 894 sq ft) — 24 homes.
- 103.75 sq m (about 1,117 sq ft) — 304 homes.
- 123.58 sq m (about 1,330 sq ft) — 164 homes.
- 123.64 sq m (about 1,331 sq ft) — 6 homes.
- 127.84 sq m (about 1,376 sq ft) — 164 homes.
- 140.88 sq m (about 1,516 sq ft) — 150 homes.
- Also listed: 57 units of 24.5–25.9 sq m and one unit of 941.98 sq m, taking the filing to 870 units.
How does it compare with Birla Pravaah and Cloverdale SPR?
Three registered projects share Sector 71. A neutral fact table:
- Tonino Lamborghini Residences — Signature Global — 12.40 acres — 812 homes — GGM/1056/788/2026/28 (8 Apr 2026) — registered completion 1 Jan 2033.
- Birla Pravaah — Birla Estates — 5.075 acres — 492 homes, all sold in December 2025 for about ₹1,800 crore (Outlook Business, 9 Dec 2025) — GGM/1006/738/2025/109 (6 Nov 2025) — completion 31 Mar 2032.
- Cloverdale SPR — Signature Global — 8 acres of a 22-acre development — 770 homes (PTI, June 2025) — GGM/955/687/2025/58 (10 Jun 2025) — completion 31 May 2031.
Where is SG SPR Estate, and what else is planned there?
SG SPR Estate is Signature Global's integrated development on the Southern Peripheral Road in Sector 71, combining homes, offices and recreation. The 25-acre business district inside it is being developed with RMZ Corporation, and the developer lists links to Dwarka Expressway, NH-48, Golf Course Road and IGI Airport (Construction World, 2 November 2026). At launch, Construction World listed the residences' amenities as a signature clubhouse, grand reception lobby, café and restaurant, banquet space, yoga areas, swimming pool, spa and salon (21 April 2026).
Branded residences in Gurugram: the market context
Tonino Lamborghini Residences is one of a growing group of branded homes in India. At launch, Construction World cited Savills India's count of branded residential schemes worldwide rising from 764 in December 2024 to a projected 910 by the end of 2025, about 19%, and Knight Frank's ranking of India sixth for branded supply with nearly 4% of global inventory (21 April 2026). With the Phase 1 sell-out, Signature Global cited a Savills report projecting nearly 25 ultra-luxury branded residential projects in India could be completed by 2032 (Construction World, 2 November 2026).
For a buyer, the brand usually shapes design, interiors and shared spaces. Ask what the brand covers after handover, and whether any branded-service fee applies; get the answer in writing.
Which fits whom?
- A buyer who wants a branded address and a long build horizon: Tonino Lamborghini Phase 2, once its price list and tower allocation are out.
- A buyer who wants an earlier registered completion in the same sector: Cloverdale SPR (May 2031). Birla Pravaah is sold out, so only resale would apply.
- Background on the cluster: Sector 71 Gurgaon Spr Buyers Guide 2026 and Signature Global SPR Estate Sector 71: Projects, Prices 2026.
What to ask before Phase 2 opens
- Which certificate covers my tower, and is the tower in Phase 2?
- What is the carpet area of my unit as per the HRERA filing?
- What is the payment plan, and are any payments linked to dates rather than construction stages?
- What are the charges beyond the base price: PLC, parking, club, IFMS and branded-service fees, if any?




