Track record · from RERA
Sobha, project by project.
On the regulators' own registers, Sobha Limited has 119 registered in Bengaluru (64 completed, 47 under way); 10 registered in Gurugram (0 completed, 9 under way); 8 registered in Tamil Nadu (6 completed, 2 under way).
137 registrations · checked 28 October 2026
Bengaluru · Karnataka RERA
119
Projects registered
64
Completed
47
Under way
Completed = an occupancy or completion certificate (or a completion application) recorded on the project's K-RERA page.
Gurugram · HARERA Gurugram
10
Projects registered
0
Completed
9
Under way
Completed = an occupancy or completion certificate filed on HARERA Gurugram.
Tamil Nadu · TNRERA
8
Projects registered
6
Completed
2
Under way
Completed = marked completed on TNRERA.
Every registration
Sobha projects on RERA
Underlined names are listed on Property Point. Newest registrations first.
| Project | Registered | Completion date on RERA | Status |
|---|---|---|---|
| ONE RESIDENCES AT SOBHA ONE WORLD Ph1 W1 and 2Hosakote · Bengaluru | May 2026 | Jul 2032 | Under way |
| ONE RESIDENCES AT SOBHA ONE WORLD Ph3 W5 and 6Hosakote · Bengaluru | May 2026 | Sept 2033 | Under way |
| ONE RESIDENCES AT SOBHA ONE WORLD Ph4 W7 and 8Hosakote · Bengaluru | May 2026 | Sept 2033 | Under way |
| ONE RESIDENCES AT SOBHA ONE WORLD Ph2 W3 and 4Hosakote · Bengaluru | May 2026 | Nov 2032 | Under way |
| ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11Hosakote · Bengaluru | May 2026 | Feb 2033 | Under way |
| ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14Hosakote · Bengaluru | May 2026 | Aug 2032 | Under way |
| SOBHA CRESCENT PHASE - 1SECTOR 63A, VILLAGE BEHRAMPUR , GURUGRAM MANESAR URBAN COMPLEX · Gurugram | Apr 2026 | Mar 2033 | Under way |
| SOBHA ALTAIRBengaluru East · Bengaluru | Jan 2026 | May 2031 | Under way |
| SOBHA MAGNUSBengaluru South · Bengaluru | Oct 2025 | May 2030 | Under way |
| Sobha Hamptons -Townpark Phase 2 W1 to 3Anekal · Bengaluru | Jan 2025 | Jun 2033 | Under way |
| Sobha Hamptons -Townpark Phase 1 W4 to 6Anekal · Bengaluru | Jan 2025 | Jun 2031 | Under way |
| Sobha Madison Heights-Townpark Phase 1 W5 to 7Anekal · Bengaluru | Jan 2025 | Dec 2030 | Under way |
| Sobha Madison Heights-Townpark Phase 2 W1 to 4Anekal · Bengaluru | Jan 2025 | Dec 2032 | Under way |
| SOBHA VERDURETamil Nadu | Dec 2024 | — | Completed |
| Sobha Infinia Phase 2A Block 5 Wing 5Bengaluru East · Bengaluru | Aug 2024 | Jun 2030 | Under way |
| Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2Bengaluru East · Bengaluru | Aug 2024 | Dec 2030 | Under way |
| SOBHA Ayana at Dream Acres Wing 60 to 71Bengaluru East · Bengaluru | Aug 2024 | Dec 2031 | Under way |
| SOBHA ALTUSREVENUE ESTATE OF VILLAGE PAW ALA KHUSRUPUR, SECTOR-106, GURUGRAM · Gurugram | May 2024 | Dec 2031 | Under way |
| SOBHA ARANYA PHASE-1SECTOR-80, REVENUE ESTATE OF VILLAGE NAURANGPUR, GURUGRAM · Gurugram | Apr 2024 | Oct 2030 | Under way |
| SOBHA Crystal Meadows Phase 1 Wing 1 to 6Bengaluru East · Bengaluru | Mar 2024 | Dec 2029 | WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved. |
Show all 137 registrationsShow fewer
| SOBHA Crystal Meadows Phase 2 Wing 7 and 8Bengaluru East · Bengaluru | Mar 2024 | Jun 2031 | WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved. |
| SOBHA Crystal Meadows Phase 3 Wing 9 to 15Bengaluru East · Bengaluru | Mar 2024 | Dec 2032 | WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved. |
| SOBHA Crystal Meadows Phase 4 Wing 23 to 28Bengaluru East · Bengaluru | Mar 2024 | Dec 2033 | WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved. |
| SOBHA Crystal Meadows Phase 5 Wing 16 to 22Bengaluru East · Bengaluru | Mar 2024 | Dec 2035 | WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved. |
| Sobha Neopolis Phase 3 - W 1, 2, 10 & 11Bengaluru East · Bengaluru | Sept 2023 | Dec 2029 | Under way |
| Sobha Neopolis Phase 4 - 3, 4, 8 & 9Bengaluru East · Bengaluru | Sept 2023 | Dec 2031 | Under way |
| Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18 &19Bengaluru East · Bengaluru | Sept 2023 | Dec 2028 | Under way |
| Sobha Neopolis Phase 2 - W 12 & 13Bengaluru East · Bengaluru | Sept 2023 | Dec 2030 | Under way |
| Sobha Neopolis Phase 5 - W 5, 6 & 7Bengaluru East · Bengaluru | Sept 2023 | Dec 2031 | Under way |
| Sobha Gardenia AnnexeTamil Nadu | Sept 2023 | Dec 2024 | Completed |
| Sobha Westhill Phase-I, II & IIITamil Nadu | Jun 2023 | Nov 2025 | Completed |
| Sobha Oakshire Phase 1 Wing 1,2,7 and 8Devanahalli · Bengaluru | Mar 2023 | Dec 2026 | Under way |
| Sobha Oakshire Phase 2 Wing 3,4,9 and 10Devanahalli · Bengaluru | Mar 2023 | Jun 2027 | Under way |
| Sobha Oakshire Phase 3 Wing 5,6,11 and 12Devanahalli · Bengaluru | Mar 2023 | Dec 2027 | Under way |
| Sobha GaleraBengaluru East · Bengaluru | Jan 2023 | Dec 2026 | Under way |
| Sobha Dream Gardens Phase 5 - Wing 10Bengaluru North · Bengaluru | Dec 2022 | Dec 2028 | Under way |
| Sobha Dream Gardens Phase 4 - Wing 1 and 2Bengaluru North · Bengaluru | Dec 2022 | Dec 2028 | Under way |
| Sobha Dream Gardens Phase 3 - Wing 3 and 4Bengaluru North · Bengaluru | Dec 2022 | Dec 2027 | Under way |
| SOBHA CITY, PHASE-6REVENUE ESTATE OF BABUPUR VIL LAGE, VILLAGE BABUPUR, SECTOR-108, GURUGRAM, HARYANA · Gurugram | Oct 2022 | Dec 2028 | Under way |
| Sobha Brooklyn Towers - Town Park Phase 1, W1Anekal · Bengaluru | Sept 2022 | Dec 2027 | Under way |
| Sobha Brooklyn Towers - Town Park Phase 3, W5Anekal · Bengaluru | Sept 2022 | Jun 2029 | Under way |
| Sobha Brooklyn Towers - Town Park Phase 4, W4Anekal · Bengaluru | Sept 2022 | Jun 2029 | Under way |
| Sobha InsigniaBengaluru East · Bengaluru | Sept 2022 | Mar 2026 | Completed Jan 2026 |
| Sobha Royal CrestBengaluru South · Bengaluru | May 2022 | Dec 2028 | Under way |
| Sobha Sentosa Phase 1 Wing 7Bengaluru East · Bengaluru | Mar 2022 | Jun 2026 | Completed Dec 2024 |
| Sobha Sentosa Phase 2 Wing 5 and 6Bengaluru East · Bengaluru | Mar 2022 | Dec 2026 | Completed Mar 2025 |
| Sobha Sentosa Phase 3 Wing 3 and 4Bengaluru East · Bengaluru | Mar 2022 | Jun 2027 | Under way |
| Sobha Sentosa Phase 4 Wing 1 and 2Bengaluru East · Bengaluru | Mar 2022 | Dec 2027 | Under way |
| Sobha Victoria park phase 1Bengaluru North · Bengaluru | Mar 2022 | Dec 2027 | Under way |
| Sobha Victoria Park Phase 2Bengaluru North · Bengaluru | Mar 2022 | Dec 2027 | Under way |
| Sobha Brooklyn Towers - Town Park Phase 2, W2Anekal · Bengaluru | Jan 2022 | Dec 2027 | Under way |
| Sobha Brooklyn Towers - Town Park Phase 5, W3Anekal · Bengaluru | Jan 2022 | Jun 2028 | Under way |
| Sobha ArborTamil Nadu | Sept 2021 | Jun 2026 | Completed |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5Anekal · Bengaluru | May 2021 | Dec 2026 | Under way |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2Anekal · Bengaluru | May 2021 | Sept 2028 | Under way |
| Sobha Windsor Phase 2 Wing 3, 4 and 5Bengaluru East · Bengaluru | Feb 2021 | Apr 2026 | Completed Nov 2025 |
| Sobha Windsor Phase 3 Wing 6, 7 and 8Bengaluru East · Bengaluru | Feb 2021 | Sept 2027 | Under way |
| Sobha Windsor Phase 4 Wing 9, 10 and 11Bengaluru East · Bengaluru | Feb 2021 | Mar 2028 | Under way |
| Sobha Windsor Phase 1 Wing 1 and 2Bengaluru East · Bengaluru | Feb 2021 | Nov 2025 | Completed Jan 2025 |
| SOBHA CITY, PHASE-5REVENUE ESTATE OF BABUPUR VIL LAGE, VILLAGE BABUPUR, SECTOR-108, GURUGRAM, HARYANA · Gurugram | Sept 2020 | Dec 2026 | Under way |
| Sobha Gardenia AnnexeTamil Nadu | Jul 2020 | Mar 2023 | Completed |
| Sobha City AthenaBengaluru North · Bengaluru | May 2020 | Sept 2027 | Under way |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58Bengaluru East · Bengaluru | Jan 2020 | Sept 2026 | Completed Nov 2025 |
| Sobha Dream Acres - Palm Springs Phase 16 Wing 50Bengaluru East · Bengaluru | Sept 2019 | Mar 2023 | Completed Mar 2023 |
| SOBHA CITY PHASE IVSECTOR-108, GURUGRAM · Gurugram | May 2019 | Dec 2024 | Under way |
| Sobha VerdureTamil Nadu | Apr 2019 | Jan 2024 | Under way |
| Sobha PalaciaTamil Nadu | Mar 2019 | Dec 2023 | Under way |
| SOBHA CITY PHASE IIISECTOR-108, GURUGRAM · Gurugram | Feb 2019 | Oct 2023 | Under way |
| Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38Bengaluru East · Bengaluru | Feb 2019 | Sept 2024 | Completed Mar 2023 |
| Sobha Dream Acres - Tropical Greens Phase 25 Wing 32, 33 and 34Bengaluru East · Bengaluru | Feb 2019 | Mar 2025 | Completed Mar 2024 |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14Bengaluru East · Bengaluru | Feb 2019 | Jun 2026 | Completed Feb 2026 |
| Sobha Royal Pavilion Phase 3 - Wing 16Bengaluru East · Bengaluru | Feb 2019 | Jun 2024 | Under way |
| Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3Bengaluru East · Bengaluru | Feb 2019 | Jun 2024 | Under way |
| Sobha Royal Pavilion Phase 6 - Wing 10 and 11Bengaluru East · Bengaluru | Feb 2019 | Jun 2026 | Completed Mar 2025 |
| Sobha Royal Pavilion Phase 1 - Wing 6 and 7Bengaluru East · Bengaluru | Feb 2019 | Jun 2024 | Completed Mar 2024 |
| Sobha Royal Pavilion Phase 8 - Wing 15Bengaluru East · Bengaluru | Feb 2019 | Jun 2026 | Completed Mar 2025 |
| Sobha Royal Pavilion Phase 2 - Wing 4 and 5Bengaluru East · Bengaluru | Feb 2019 | Jun 2024 | Completed Mar 2024 |
| Sobha Royal Pavilion Phase 5 - Wing 8 and 9Bengaluru East · Bengaluru | Feb 2019 | Jun 2026 | Completed Jul 2026 |
| Sobha Dream Gardens Phase 2 – Wing 5, 6 and 7Bengaluru North · Bengaluru | Jan 2019 | Nov 2024 | Completed Mar 2024 |
| Sobha Dream Gardens Phase 3 – Wing 3 and 4Bengaluru North · Bengaluru | Jan 2019 | Nov 2025 | WITHDRAWN As per Hon'ble Authority order dated 23/03/2022, application for withdrawal is approved |
| Sobha Dream Gardens Phase 1 – Wing 8 and 9Bengaluru North · Bengaluru | Nov 2018 | Nov 2024 | Completed Oct 2024 |
| Sobha Dream Gardens Phase 4 – Wing 1 and 2Bengaluru North · Bengaluru | Nov 2018 | Nov 2025 | WITHDRAWN As per Hon'ble Authority order dated 23/03/2022, application for withdrawal is approved |
| Sobha Dream Gardens Phase 5 – Wing 10Bengaluru North · Bengaluru | Nov 2018 | Nov 2025 | WITHDRAWN As per Hon'ble Authority order dated 23/03/2022, application for withdrawal is approved |
| Sobha RajvilasBengaluru North · Bengaluru | Nov 2018 | Mar 2025 | Completed Jul 2024 |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 and 22Bengaluru East · Bengaluru | Oct 2018 | Mar 2026 | Completed Feb 2026 |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24Bengaluru East · Bengaluru | Oct 2018 | Mar 2026 | Completed Feb 2026 |
| Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28Bengaluru East · Bengaluru | Oct 2018 | Sept 2024 | Completed Mar 2024 |
| Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30Bengaluru East · Bengaluru | Oct 2018 | Mar 2025 | Completed Mar 2024 |
| SOBHA CITY (PHASE-2, PART-1)SECTOR-108, GURUGRAM · Gurugram | Jul 2018 | Oct 2022 | Registration lapsed |
| Sobha Dream Acres - Tropical Greens Phase 20 Wing 18Bengaluru East · Bengaluru | Jun 2018 | Dec 2023 | Completed Dec 2020 |
| Sobha Lake Gardens Phase 1Bengaluru East · Bengaluru | Jun 2018 | Feb 2024 | Completed Aug 2023 |
| Sobha Lake Gardens Phase 2Bengaluru East · Bengaluru | Jun 2018 | Dec 2025 | Completed Nov 2025 |
| Sobha Dream Acres - Tropical Greens Phase 19 Wings 19 and 20Bengaluru East · Bengaluru | Jun 2018 | Sept 2023 | Completed Dec 2020 |
| Sobha Arena - Pebble Court (Block 1)Bengaluru South · Bengaluru | May 2018 | Jan 2023 | Completed Jan 2023 |
| Sobha Arena - The Square (Block 4)Bengaluru South · Bengaluru | Apr 2018 | Sept 2022 | Completed Apr 2021 |
| Sobha Forest EdgeBengaluru South · Bengaluru | Feb 2018 | Jun 2023 | Completed Sept 2023 |
| Construction of Ground Floor+ First Floor VillasTamil Nadu | Jan 2018 | Aug 2023 | Completed |
| Sobha HRC Pristine Phase 1 Block 1Bengaluru North · Bengaluru | Nov 2017 | Apr 2023 | Completed May 2023 |
| Sobha HRC Pristine Phase 4 Block 4 and 5Bengaluru North · Bengaluru | Nov 2017 | Apr 2023 | Completed May 2023 |
| Sobha - HRC Pristine Phase 3 Block 3Bengaluru North · Bengaluru | Nov 2017 | Apr 2023 | Completed May 2023 |
| Sobha HRC Pristine Phase 2 Block 2Bengaluru North · Bengaluru | Nov 2017 | Apr 2023 | Completed May 2023 |
| Sobha Dream Acres - Palm Springs Phase 17 Wing 54Bengaluru East · Bengaluru | Oct 2017 | Jan 2023 | Completed Dec 2020 |
| Sobha Dream Acres - Tropical Greens Phase 18 Wing 39 and 40Bengaluru East · Bengaluru | Oct 2017 | Jul 2023 | Completed Dec 2020 |
| Sobha City - Casa Paradiso Block 4Bengaluru North · Bengaluru | Oct 2017 | Dec 2018 | Completed Dec 2016 |
| Sobha ClovellyBengaluru South · Bengaluru | Oct 2017 | Oct 2020 | Completed Dec 2019 |
| Sobha Arena - The Plaza (Block 3)Bengaluru South · Bengaluru | Sept 2017 | Oct 2019 | Completed Oct 2019 |
| Sobha Morzaria Grandeur 2 (W1)Bengaluru South · Bengaluru | Sept 2017 | Feb 2022 | Completed May 2022 |
| Sobha Arena - The Park ( Block 2 )Bengaluru South · Bengaluru | Sept 2017 | May 2018 | Completed May 2018 |
| Sobha AvenueBengaluru East · Bengaluru | Sept 2017 | Jul 2019 | Completed Jun 2019 |
| Sobha Dream Acres - Rain forest Phase 15 Wing 17Bengaluru East · Bengaluru | Sept 2017 | Nov 2019 | Completed Jul 2019 |
| Sobha 25 RichmondBengaluru East · Bengaluru | Sept 2017 | Jul 2019 | Under way |
| Sobha Valley View - HeritageBengaluru South · Bengaluru | Sept 2017 | Feb 2019 | Under way |
| Sobha Palm CourtBengaluru North · Bengaluru | Sept 2017 | Feb 2022 | Completed Mar 2022 |
| Sobha IndraprasthaBengaluru North · Bengaluru | Sept 2017 | Dec 2018 | Completed Jun 2019 |
| Sobha Dream Acres - Palm Springs Phase 12 Wing 48 and 49Bengaluru East · Bengaluru | Sept 2017 | Jul 2022 | Completed Dec 2020 |
| Sobha Dream Acres - Rain Forest Phase 3 Wing 5 and 6Bengaluru East · Bengaluru | Sept 2017 | Jan 2021 | Completed Jul 2019 |
| Sobha Silicon Oasis Phase 7 Block 2 and 3 (Row House No. 9, 10)Bengaluru South · Bengaluru | Sept 2017 | Apr 2019 | Completed Jul 2019 |
| Sobha Dream Acres - Rain forest Phase 1 Wing 1 and 2Bengaluru East · Bengaluru | Sept 2017 | Nov 2019 | Completed Jul 2019 |
| Sobha Dream Acres - Tropical Greens Phase 8 Wing 43 and 44Bengaluru East · Bengaluru | Sept 2017 | Jul 2021 | Completed Jan 2020 |
| Sobha Dream Acres - Rain Forest Phase 2 Wing 3 and 4Bengaluru East · Bengaluru | Sept 2017 | Oct 2020 | Completed Jul 2019 |
| Sobha Dream Acres - Palm Springs Phase 11 Wing 47Bengaluru East · Bengaluru | Sept 2017 | Dec 2021 | Completed Jan 2020 |
| Sobha Dream Acres - Rain Forest Phase 5 Wing 16Bengaluru East · Bengaluru | Sept 2017 | Sept 2019 | Completed Jul 2019 |
| Sobha Dream Acres - Tropical Greens Phase 6 Wing 41Bengaluru East · Bengaluru | Sept 2017 | Nov 2020 | Completed Jan 2020 |
| Sobha Dream Acres - Tropical Greens Phase 10 Wing 46Bengaluru East · Bengaluru | Sept 2017 | Jan 2022 | Completed Jan 2020 |
| Sobha Dream Acres - Palm Springs Phase 13 Wing 52Bengaluru South · Bengaluru | Sept 2017 | Apr 2022 | Completed Dec 2020 |
| Sobha Dream Acres - Rain Forest Phase 4 Wing 11Bengaluru East · Bengaluru | Sept 2017 | Jul 2020 | Completed Jul 2019 |
| Sobha Dream Acres - Tropical Greens Phase 7 Wing 42Bengaluru East · Bengaluru | Sept 2017 | Jan 2021 | Completed Jan 2020 |
| Sobha Dream Acres - Tropical Greens Phase 9 Wing 45Bengaluru East · Bengaluru | Sept 2017 | Jul 2021 | Completed Jan 2020 |
| Sobha Dream Acres - Palm Springs Phase 14 Wing 53Bengaluru East · Bengaluru | Sept 2017 | Jul 2022 | Completed Dec 2020 |
| Sobha Silicon Oasis Phase 2 Wing 7Bengaluru South · Bengaluru | Sept 2017 | Jan 2020 | Under way |
| Sobha Silicon Oasis Phase 5 Wing 10 & 11Bengaluru South · Bengaluru | Sept 2017 | Oct 2021 | Completed Aug 2020 |
| Sobha Silicon Oasis Phase 6 Block 2 and 3 (Row house No. 1 to 8 & 11 to 17)Bengaluru South · Bengaluru | Sept 2017 | Apr 2019 | Completed Aug 2020 |
| Sobha Silicon Oasis Phase 4 Wing 9Bengaluru South · Bengaluru | Sept 2017 | Oct 2021 | Completed Aug 2020 |
| SOBHA CITY- PHASE 1,PART 2VILLAGE BABUPUR,SECTOR-108, G URUGRAM · Gurugram | Aug 2017 | May 2022 | Under way |
| Sobha Silicon Oasis Phase 1 Wing 1, 2, 3, 4, 5 & 6Bengaluru South · Bengaluru | Aug 2017 | Apr 2019 | Completed Jul 2019 |
| Sobha Silicon Oasis Phase 3 Wing 8Bengaluru South · Bengaluru | Aug 2017 | Apr 2021 | Completed Aug 2020 |
| SOBHA CITY PHASE 1, PART 1SECTOR 108, BABUPUR, GURUGRAM · Gurugram | Aug 2017 | Oct 2021 | Under way |
Companies these projects are registered under (10)
- SOBHA LIMITED · Gurugram
- SOBHA LTD · Gurugram
- SOBHA LTD. · Gurugram
- SOBHA LIMITED · Bengaluru
- Sobha Limited · Bengaluru
- 1) M/s. Sobha Limited · Tamil Nadu
- SOBHA LIMITED · Tamil Nadu
- SOBHA Ltd & M/s. Tarapur Constructions Pvt. Ltd. · Tamil Nadu
- Sobha Limited · Tamil Nadu
- Sobha Ltd. · Tamil Nadu
How to read this
- Every project the builder has registered with RERA, as filed on each state's public register, with its registration month and the completion date currently on record.
- Completion date on RERA is the latest date on the register; regulators update it for many reasons, including the blanket extensions granted to all projects in 2020–21.
- Projects are matched to builders by the registered promoter company and, for joint ventures, by the project name. A registration is left out when the match is uncertain.
Sources
- Karnataka RERA — Bengaluru Urban and Bengaluru Rural districts
- HARERA Gurugram — Gurugram
- TNRERA — Tamil Nadu building projects
- Data as filed by builders on each regulator's public register, last checked Oct 2026 (28 October 2026). Registers can lag; verify any figure on the regulator's site before you rely on it.
Good to know
Questions buyers ask
How many Sobha Limited projects are registered with RERA?+
119 with Karnataka RERA (Bengaluru Urban and Bengaluru Rural districts); 10 with HARERA Gurugram (Gurugram); 8 with TNRERA (Tamil Nadu building projects). 70 of them are completed and 58 are ongoing.
How can I check a Sobha project's RERA record myself?+
Search the project's registration number on Karnataka RERA (rera.karnataka.gov.in) or HARERA Gurugram (haryanarera.gov.in) or TNRERA (rera.tn.gov.in). The page shows the project's approvals, its completion date and, once finished, its occupancy or completion certificate.
Compare Sobha with the other developers we track, or see the Sobha homes listed now.