On the regulators' own registers, Sobha Limited has 119 registered in Bengaluru (64 completed, 47 under way); 10 registered in Gurugram (0 completed, 9 under way); 8 registered in Tamil Nadu (6 completed, 2 under way).

137 registrations · checked 28 October 2026

Bengaluru · Karnataka RERA

119

Projects registered

64

Completed

47

Under way

Completed = an occupancy or completion certificate (or a completion application) recorded on the project's K-RERA page.

Gurugram · HARERA Gurugram

10

Projects registered

0

Completed

9

Under way

Completed = an occupancy or completion certificate filed on HARERA Gurugram.

Tamil Nadu · TNRERA

8

Projects registered

6

Completed

2

Under way

Completed = marked completed on TNRERA.

Every registration

Sobha projects on RERA

Underlined names are listed on Property Point. Newest registrations first.

ProjectRegisteredCompletion date on RERAStatus
ONE RESIDENCES AT SOBHA ONE WORLD Ph1 W1 and 2Hosakote · BengaluruMay 2026Jul 2032Under way
ONE RESIDENCES AT SOBHA ONE WORLD Ph3 W5 and 6Hosakote · BengaluruMay 2026Sept 2033Under way
ONE RESIDENCES AT SOBHA ONE WORLD Ph4 W7 and 8Hosakote · BengaluruMay 2026Sept 2033Under way
ONE RESIDENCES AT SOBHA ONE WORLD Ph2 W3 and 4Hosakote · BengaluruMay 2026Nov 2032Under way
ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11Hosakote · BengaluruMay 2026Feb 2033Under way
ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14Hosakote · BengaluruMay 2026Aug 2032Under way
SOBHA CRESCENT PHASE - 1SECTOR 63A, VILLAGE BEHRAMPUR , GURUGRAM MANESAR URBAN COMPLEX · GurugramApr 2026Mar 2033Under way
SOBHA ALTAIRBengaluru East · BengaluruJan 2026May 2031Under way
SOBHA MAGNUSBengaluru South · BengaluruOct 2025May 2030Under way
Sobha Hamptons -Townpark Phase 2 W1 to 3Anekal · BengaluruJan 2025Jun 2033Under way
Sobha Hamptons -Townpark Phase 1 W4 to 6Anekal · BengaluruJan 2025Jun 2031Under way
Sobha Madison Heights-Townpark Phase 1 W5 to 7Anekal · BengaluruJan 2025Dec 2030Under way
Sobha Madison Heights-Townpark Phase 2 W1 to 4Anekal · BengaluruJan 2025Dec 2032Under way
SOBHA VERDURETamil NaduDec 2024—Completed
Sobha Infinia Phase 2A Block 5 Wing 5Bengaluru East · BengaluruAug 2024Jun 2030Under way
Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2Bengaluru East · BengaluruAug 2024Dec 2030Under way
SOBHA Ayana at Dream Acres Wing 60 to 71Bengaluru East · BengaluruAug 2024Dec 2031Under way
SOBHA ALTUSREVENUE ESTATE OF VILLAGE PAW ALA KHUSRUPUR, SECTOR-106, GURUGRAM · GurugramMay 2024Dec 2031Under way
SOBHA ARANYA PHASE-1SECTOR-80, REVENUE ESTATE OF VILLAGE NAURANGPUR, GURUGRAM · GurugramApr 2024Oct 2030Under way
SOBHA Crystal Meadows Phase 1 Wing 1 to 6Bengaluru East · BengaluruMar 2024Dec 2029WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved.
Show all 137 registrations
SOBHA Crystal Meadows Phase 2 Wing 7 and 8Bengaluru East · BengaluruMar 2024Jun 2031WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved.
SOBHA Crystal Meadows Phase 3 Wing 9 to 15Bengaluru East · BengaluruMar 2024Dec 2032WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved.
SOBHA Crystal Meadows Phase 4 Wing 23 to 28Bengaluru East · BengaluruMar 2024Dec 2033WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved.
SOBHA Crystal Meadows Phase 5 Wing 16 to 22Bengaluru East · BengaluruMar 2024Dec 2035WITHDRAWN As per the Hon'ble Authority Order dated 29/06/2026 application for project Withdrawal is Approved.
Sobha Neopolis Phase 3 - W 1, 2, 10 & 11Bengaluru East · BengaluruSept 2023Dec 2029Under way
Sobha Neopolis Phase 4 - 3, 4, 8 & 9Bengaluru East · BengaluruSept 2023Dec 2031Under way
Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18 &19Bengaluru East · BengaluruSept 2023Dec 2028Under way
Sobha Neopolis Phase 2 - W 12 & 13Bengaluru East · BengaluruSept 2023Dec 2030Under way
Sobha Neopolis Phase 5 - W 5, 6 & 7Bengaluru East · BengaluruSept 2023Dec 2031Under way
Sobha Gardenia AnnexeTamil NaduSept 2023Dec 2024Completed
Sobha Westhill Phase-I, II & IIITamil NaduJun 2023Nov 2025Completed
Sobha Oakshire Phase 1 Wing 1,2,7 and 8Devanahalli · BengaluruMar 2023Dec 2026Under way
Sobha Oakshire Phase 2 Wing 3,4,9 and 10Devanahalli · BengaluruMar 2023Jun 2027Under way
Sobha Oakshire Phase 3 Wing 5,6,11 and 12Devanahalli · BengaluruMar 2023Dec 2027Under way
Sobha GaleraBengaluru East · BengaluruJan 2023Dec 2026Under way
Sobha Dream Gardens Phase 5 - Wing 10Bengaluru North · BengaluruDec 2022Dec 2028Under way
Sobha Dream Gardens Phase 4 - Wing 1 and 2Bengaluru North · BengaluruDec 2022Dec 2028Under way
Sobha Dream Gardens Phase 3 - Wing 3 and 4Bengaluru North · BengaluruDec 2022Dec 2027Under way
SOBHA CITY, PHASE-6REVENUE ESTATE OF BABUPUR VIL LAGE, VILLAGE BABUPUR, SECTOR-108, GURUGRAM, HARYANA · GurugramOct 2022Dec 2028Under way
Sobha Brooklyn Towers - Town Park Phase 1, W1Anekal · BengaluruSept 2022Dec 2027Under way
Sobha Brooklyn Towers - Town Park Phase 3, W5Anekal · BengaluruSept 2022Jun 2029Under way
Sobha Brooklyn Towers - Town Park Phase 4, W4Anekal · BengaluruSept 2022Jun 2029Under way
Sobha InsigniaBengaluru East · BengaluruSept 2022Mar 2026Completed Jan 2026
Sobha Royal CrestBengaluru South · BengaluruMay 2022Dec 2028Under way
Sobha Sentosa Phase 1 Wing 7Bengaluru East · BengaluruMar 2022Jun 2026Completed Dec 2024
Sobha Sentosa Phase 2 Wing 5 and 6Bengaluru East · BengaluruMar 2022Dec 2026Completed Mar 2025
Sobha Sentosa Phase 3 Wing 3 and 4Bengaluru East · BengaluruMar 2022Jun 2027Under way
Sobha Sentosa Phase 4 Wing 1 and 2Bengaluru East · BengaluruMar 2022Dec 2027Under way
Sobha Victoria park phase 1Bengaluru North · BengaluruMar 2022Dec 2027Under way
Sobha Victoria Park Phase 2Bengaluru North · BengaluruMar 2022Dec 2027Under way
Sobha Brooklyn Towers - Town Park Phase 2, W2Anekal · BengaluruJan 2022Dec 2027Under way
Sobha Brooklyn Towers - Town Park Phase 5, W3Anekal · BengaluruJan 2022Jun 2028Under way
Sobha ArborTamil NaduSept 2021Jun 2026Completed
Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5Anekal · BengaluruMay 2021Dec 2026Under way
Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2Anekal · BengaluruMay 2021Sept 2028Under way
Sobha Windsor Phase 2 Wing 3, 4 and 5Bengaluru East · BengaluruFeb 2021Apr 2026Completed Nov 2025
Sobha Windsor Phase 3 Wing 6, 7 and 8Bengaluru East · BengaluruFeb 2021Sept 2027Under way
Sobha Windsor Phase 4 Wing 9, 10 and 11Bengaluru East · BengaluruFeb 2021Mar 2028Under way
Sobha Windsor Phase 1 Wing 1 and 2Bengaluru East · BengaluruFeb 2021Nov 2025Completed Jan 2025
SOBHA CITY, PHASE-5REVENUE ESTATE OF BABUPUR VIL LAGE, VILLAGE BABUPUR, SECTOR-108, GURUGRAM, HARYANA · GurugramSept 2020Dec 2026Under way
Sobha Gardenia AnnexeTamil NaduJul 2020Mar 2023Completed
Sobha City AthenaBengaluru North · BengaluruMay 2020Sept 2027Under way
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58Bengaluru East · BengaluruJan 2020Sept 2026Completed Nov 2025
Sobha Dream Acres - Palm Springs Phase 16 Wing 50Bengaluru East · BengaluruSept 2019Mar 2023Completed Mar 2023
SOBHA CITY PHASE IVSECTOR-108, GURUGRAM · GurugramMay 2019Dec 2024Under way
Sobha VerdureTamil NaduApr 2019Jan 2024Under way
Sobha PalaciaTamil NaduMar 2019Dec 2023Under way
SOBHA CITY PHASE IIISECTOR-108, GURUGRAM · GurugramFeb 2019Oct 2023Under way
Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38Bengaluru East · BengaluruFeb 2019Sept 2024Completed Mar 2023
Sobha Dream Acres - Tropical Greens Phase 25 Wing 32, 33 and 34Bengaluru East · BengaluruFeb 2019Mar 2025Completed Mar 2024
Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14Bengaluru East · BengaluruFeb 2019Jun 2026Completed Feb 2026
Sobha Royal Pavilion Phase 3 - Wing 16Bengaluru East · BengaluruFeb 2019Jun 2024Under way
Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3Bengaluru East · BengaluruFeb 2019Jun 2024Under way
Sobha Royal Pavilion Phase 6 - Wing 10 and 11Bengaluru East · BengaluruFeb 2019Jun 2026Completed Mar 2025
Sobha Royal Pavilion Phase 1 - Wing 6 and 7Bengaluru East · BengaluruFeb 2019Jun 2024Completed Mar 2024
Sobha Royal Pavilion Phase 8 - Wing 15Bengaluru East · BengaluruFeb 2019Jun 2026Completed Mar 2025
Sobha Royal Pavilion Phase 2 - Wing 4 and 5Bengaluru East · BengaluruFeb 2019Jun 2024Completed Mar 2024
Sobha Royal Pavilion Phase 5 - Wing 8 and 9Bengaluru East · BengaluruFeb 2019Jun 2026Completed Jul 2026
Sobha Dream Gardens Phase 2 – Wing 5, 6 and 7Bengaluru North · BengaluruJan 2019Nov 2024Completed Mar 2024
Sobha Dream Gardens Phase 3 – Wing 3 and 4Bengaluru North · BengaluruJan 2019Nov 2025WITHDRAWN As per Hon'ble Authority order dated 23/03/2022, application for withdrawal is approved
Sobha Dream Gardens Phase 1 – Wing 8 and 9Bengaluru North · BengaluruNov 2018Nov 2024Completed Oct 2024
Sobha Dream Gardens Phase 4 – Wing 1 and 2Bengaluru North · BengaluruNov 2018Nov 2025WITHDRAWN As per Hon'ble Authority order dated 23/03/2022, application for withdrawal is approved
Sobha Dream Gardens Phase 5 – Wing 10Bengaluru North · BengaluruNov 2018Nov 2025WITHDRAWN As per Hon'ble Authority order dated 23/03/2022, application for withdrawal is approved
Sobha RajvilasBengaluru North · BengaluruNov 2018Mar 2025Completed Jul 2024
Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 and 22Bengaluru East · BengaluruOct 2018Mar 2026Completed Feb 2026
Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24Bengaluru East · BengaluruOct 2018Mar 2026Completed Feb 2026
Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28Bengaluru East · BengaluruOct 2018Sept 2024Completed Mar 2024
Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30Bengaluru East · BengaluruOct 2018Mar 2025Completed Mar 2024
SOBHA CITY (PHASE-2, PART-1)SECTOR-108, GURUGRAM · GurugramJul 2018Oct 2022Registration lapsed
Sobha Dream Acres - Tropical Greens Phase 20 Wing 18Bengaluru East · BengaluruJun 2018Dec 2023Completed Dec 2020
Sobha Lake Gardens Phase 1Bengaluru East · BengaluruJun 2018Feb 2024Completed Aug 2023
Sobha Lake Gardens Phase 2Bengaluru East · BengaluruJun 2018Dec 2025Completed Nov 2025
Sobha Dream Acres - Tropical Greens Phase 19 Wings 19 and 20Bengaluru East · BengaluruJun 2018Sept 2023Completed Dec 2020
Sobha Arena - Pebble Court (Block 1)Bengaluru South · BengaluruMay 2018Jan 2023Completed Jan 2023
Sobha Arena - The Square (Block 4)Bengaluru South · BengaluruApr 2018Sept 2022Completed Apr 2021
Sobha Forest EdgeBengaluru South · BengaluruFeb 2018Jun 2023Completed Sept 2023
Construction of Ground Floor+ First Floor VillasTamil NaduJan 2018Aug 2023Completed
Sobha HRC Pristine Phase 1 Block 1Bengaluru North · BengaluruNov 2017Apr 2023Completed May 2023
Sobha HRC Pristine Phase 4 Block 4 and 5Bengaluru North · BengaluruNov 2017Apr 2023Completed May 2023
Sobha - HRC Pristine Phase 3 Block 3Bengaluru North · BengaluruNov 2017Apr 2023Completed May 2023
Sobha HRC Pristine Phase 2 Block 2Bengaluru North · BengaluruNov 2017Apr 2023Completed May 2023
Sobha Dream Acres - Palm Springs Phase 17 Wing 54Bengaluru East · BengaluruOct 2017Jan 2023Completed Dec 2020
Sobha Dream Acres - Tropical Greens Phase 18 Wing 39 and 40Bengaluru East · BengaluruOct 2017Jul 2023Completed Dec 2020
Sobha City - Casa Paradiso Block 4Bengaluru North · BengaluruOct 2017Dec 2018Completed Dec 2016
Sobha ClovellyBengaluru South · BengaluruOct 2017Oct 2020Completed Dec 2019
Sobha Arena - The Plaza (Block 3)Bengaluru South · BengaluruSept 2017Oct 2019Completed Oct 2019
Sobha Morzaria Grandeur 2 (W1)Bengaluru South · BengaluruSept 2017Feb 2022Completed May 2022
Sobha Arena - The Park ( Block 2 )Bengaluru South · BengaluruSept 2017May 2018Completed May 2018
Sobha AvenueBengaluru East · BengaluruSept 2017Jul 2019Completed Jun 2019
Sobha Dream Acres - Rain forest Phase 15 Wing 17Bengaluru East · BengaluruSept 2017Nov 2019Completed Jul 2019
Sobha 25 RichmondBengaluru East · BengaluruSept 2017Jul 2019Under way
Sobha Valley View - HeritageBengaluru South · BengaluruSept 2017Feb 2019Under way
Sobha Palm CourtBengaluru North · BengaluruSept 2017Feb 2022Completed Mar 2022
Sobha IndraprasthaBengaluru North · BengaluruSept 2017Dec 2018Completed Jun 2019
Sobha Dream Acres - Palm Springs Phase 12 Wing 48 and 49Bengaluru East · BengaluruSept 2017Jul 2022Completed Dec 2020
Sobha Dream Acres - Rain Forest Phase 3 Wing 5 and 6Bengaluru East · BengaluruSept 2017Jan 2021Completed Jul 2019
Sobha Silicon Oasis Phase 7 Block 2 and 3 (Row House No. 9, 10)Bengaluru South · BengaluruSept 2017Apr 2019Completed Jul 2019
Sobha Dream Acres - Rain forest Phase 1 Wing 1 and 2Bengaluru East · BengaluruSept 2017Nov 2019Completed Jul 2019
Sobha Dream Acres - Tropical Greens Phase 8 Wing 43 and 44Bengaluru East · BengaluruSept 2017Jul 2021Completed Jan 2020
Sobha Dream Acres - Rain Forest Phase 2 Wing 3 and 4Bengaluru East · BengaluruSept 2017Oct 2020Completed Jul 2019
Sobha Dream Acres - Palm Springs Phase 11 Wing 47Bengaluru East · BengaluruSept 2017Dec 2021Completed Jan 2020
Sobha Dream Acres - Rain Forest Phase 5 Wing 16Bengaluru East · BengaluruSept 2017Sept 2019Completed Jul 2019
Sobha Dream Acres - Tropical Greens Phase 6 Wing 41Bengaluru East · BengaluruSept 2017Nov 2020Completed Jan 2020
Sobha Dream Acres - Tropical Greens Phase 10 Wing 46Bengaluru East · BengaluruSept 2017Jan 2022Completed Jan 2020
Sobha Dream Acres - Palm Springs Phase 13 Wing 52Bengaluru South · BengaluruSept 2017Apr 2022Completed Dec 2020
Sobha Dream Acres - Rain Forest Phase 4 Wing 11Bengaluru East · BengaluruSept 2017Jul 2020Completed Jul 2019
Sobha Dream Acres - Tropical Greens Phase 7 Wing 42Bengaluru East · BengaluruSept 2017Jan 2021Completed Jan 2020
Sobha Dream Acres - Tropical Greens Phase 9 Wing 45Bengaluru East · BengaluruSept 2017Jul 2021Completed Jan 2020
Sobha Dream Acres - Palm Springs Phase 14 Wing 53Bengaluru East · BengaluruSept 2017Jul 2022Completed Dec 2020
Sobha Silicon Oasis Phase 2 Wing 7Bengaluru South · BengaluruSept 2017Jan 2020Under way
Sobha Silicon Oasis Phase 5 Wing 10 & 11Bengaluru South · BengaluruSept 2017Oct 2021Completed Aug 2020
Sobha Silicon Oasis Phase 6 Block 2 and 3 (Row house No. 1 to 8 & 11 to 17)Bengaluru South · BengaluruSept 2017Apr 2019Completed Aug 2020
Sobha Silicon Oasis Phase 4 Wing 9Bengaluru South · BengaluruSept 2017Oct 2021Completed Aug 2020
SOBHA CITY- PHASE 1,PART 2VILLAGE BABUPUR,SECTOR-108, G URUGRAM · GurugramAug 2017May 2022Under way
Sobha Silicon Oasis Phase 1 Wing 1, 2, 3, 4, 5 & 6Bengaluru South · BengaluruAug 2017Apr 2019Completed Jul 2019
Sobha Silicon Oasis Phase 3 Wing 8Bengaluru South · BengaluruAug 2017Apr 2021Completed Aug 2020
SOBHA CITY PHASE 1, PART 1SECTOR 108, BABUPUR, GURUGRAM · GurugramAug 2017Oct 2021Under way
Companies these projects are registered under (10)
  • SOBHA LIMITED · Gurugram
  • SOBHA LTD · Gurugram
  • SOBHA LTD. · Gurugram
  • SOBHA LIMITED · Bengaluru
  • Sobha Limited · Bengaluru
  • 1) M/s. Sobha Limited · Tamil Nadu
  • SOBHA LIMITED · Tamil Nadu
  • SOBHA Ltd & M/s. Tarapur Constructions Pvt. Ltd. · Tamil Nadu
  • Sobha Limited · Tamil Nadu
  • Sobha Ltd. · Tamil Nadu

How to read this

  • Every project the builder has registered with RERA, as filed on each state's public register, with its registration month and the completion date currently on record.
  • Completion date on RERA is the latest date on the register; regulators update it for many reasons, including the blanket extensions granted to all projects in 2020–21.
  • Projects are matched to builders by the registered promoter company and, for joint ventures, by the project name. A registration is left out when the match is uncertain.

Sources

  • Karnataka RERA — Bengaluru Urban and Bengaluru Rural districts
  • HARERA Gurugram — Gurugram
  • TNRERA — Tamil Nadu building projects
  • Data as filed by builders on each regulator's public register, last checked Oct 2026 (28 October 2026). Registers can lag; verify any figure on the regulator's site before you rely on it.

Good to know

Questions buyers ask

How many Sobha Limited projects are registered with RERA?+

119 with Karnataka RERA (Bengaluru Urban and Bengaluru Rural districts); 10 with HARERA Gurugram (Gurugram); 8 with TNRERA (Tamil Nadu building projects). 70 of them are completed and 58 are ongoing.

How can I check a Sobha project's RERA record myself?+

Search the project's registration number on Karnataka RERA (rera.karnataka.gov.in) or HARERA Gurugram (haryanarera.gov.in) or TNRERA (rera.tn.gov.in). The page shows the project's approvals, its completion date and, once finished, its occupancy or completion certificate.