Chennai Metro · Yellow Line (Corridor 4) and Red Line (Corridor 5)
Alapakkam Metro Station: homes within 2 km
Alapakkam is an interchange on the Yellow Line (Corridor 4) and Red Line (Corridor 5) of Chennai Metro. The Yellow Line (Corridor 4) here is under construction; target March 2027 (Reported, The Hindu (via Swarajya), 29 Oct 2026; earlier reports said December 2026; status checked 22 October 2026). The Red Line (Corridor 5) here is under construction on the Koyambedu – Chennai Trade Centre stretch; target trials Nov 2026, service early 2027 (CMRL Director (Projects), via Construction World, 8 Sep 2026; status checked 20 October 2026). Within 2 km of the station we list 5 new-launch and under-construction projects, from ₹96 L, and 1 ready-to-move.
Within 2 km, nearest first
5 new homes near Alapakkam
| Project | Distance | From | Homes | Possession |
|---|---|---|---|---|
| Navin's Krishna CoveNavin's · Porur2 and 3 BHK · Dec 2028 | 1.6 km | ₹1.45 Cr | 2 and 3 BHK | Dec 2028 |
| DAC BalmandaisaDAC Developers · Porur, Mount-Poonamallee Road2, 3, 4 and 5 BHK · Jul 2031 | 1.6 km | ₹1.19 Cr | 2, 3, 4 and 5 BHK | Jul 2031 |
| Casagrand OsakaCasagrand · Porur3 and 4 BHK · May 2030 | 1.6 km | ₹96 L | 3 and 4 BHK | May 2030 |
| Navin's Mayura GardensNavin's · Valasaravakkam2, 3 and 4 BHK · Dec 2028 | 1.7 km | ₹1.44 Cr | 2, 3 and 4 BHK | Dec 2028 |
| DRA InfiniqueDRA Homes · Valasaravakkam3 and 4 BHK · Nov 2031 | 1.7 km | ₹2.4 Cr | 3 and 4 BHK | Nov 2031 |
Ready-to-move homes within 2 km (1) are not listed here.
The station
Lines and status
- Yellow Line (Corridor 4)Under construction
- Alapakkam, Karambakkam, Valasaravakkam, Alwarthirunagar, Saligramam, Avichi SchoolTarget March 2027Reported, The Hindu (via Swarajya), 29 Oct 2026; earlier reports said December 2026; status checked 22 October 2026
- Red Line (Corridor 5)Under construction
- Koyambedu – Chennai Trade CentreTarget Trials Nov 2026 · service early 2027CMRL Director (Projects), via Construction World, 8 Sep 2026; status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
