Chennai Metro · Green Line and Purple Line (Corridor 3)
Kilpauk Metro Station: homes within 2 km
Kilpauk is an interchange on the Green Line and Purple Line (Corridor 3) of Chennai Metro. The Green Line here has been open end to end since 25 May 2018 (Wikipedia; The Hindu, 25 May 2018; as of October 2026). The Purple Line (Corridor 3) here is under construction on the Madhavaram – Taramani (underground) stretch; target 2028 (CMRL official, via TOI, Feb 2026; status checked 20 October 2026). Within 2 km of the station we list 1 new-launch and under-construction project, from ₹6.97 Cr.
Within 2 km, nearest first
1 new home near Kilpauk
| Project | Distance | From | Homes | Possession |
|---|---|---|---|---|
| Navin's Aum GrihaNavin's · Nungambakkam (College Road)3 BHK · Oct 2027 | 1.5 km | ₹6.97 Cr | 3 BHK | Oct 2027 |
The station
Lines and status
- Green LineOpen
- Open end to end since 25 May 2018Wikipedia; The Hindu, 25 May 2018; as of October 2026
- Purple Line (Corridor 3)Under construction
- Madhavaram – Taramani (underground)Target 2028CMRL official, via TOI, Feb 2026; status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
