Chennai Metro · Purple Line (Corridor 3)
SIPCOT 2 Metro Station: homes within 2 km
SIPCOT 2 is on the Purple Line (Corridor 3) of Chennai Metro. The Purple Line (Corridor 3) here is under construction; target around March 2027 (CMRL aim for its elevated corridors, via TOI, Feb 2026; status checked 20 October 2026). Within 2 km of the station we list 1 new-launch and under-construction project, from ₹1.26 Cr.
Within 2 km, nearest first
1 new home near SIPCOT 2
| Project | Distance | From | Homes | Possession |
|---|---|---|---|---|
| DRA Marina 100DRA Homes · Egattur (Navalur), OMR2 and 3 BHK · Feb 2031 | 2.0 km | ₹1.26 Cr | 2 and 3 BHK | Feb 2031 |
The station
Line and status
- Purple Line (Corridor 3)Under construction
- Nehru Nagar – Sholinganallur – SIPCOT (elevated, OMR)Target Around March 2027CMRL aim for its elevated corridors, via TOI, Feb 2026; status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
