Chennai Metro · Purple Line (Corridor 3)
Thiruvanmiyur Metro Station: homes within 2 km
Thiruvanmiyur is on the Purple Line (Corridor 3) of Chennai Metro. The Purple Line (Corridor 3) here is under construction on the Madhavaram – Taramani (underground) stretch; target 2028 (CMRL official, via TOI, Feb 2026; status checked 20 October 2026). Within 2 km of the station we list 6 new-launch and under-construction projects, from ₹1.59 Cr.
Within 2 km, nearest first
6 new homes near Thiruvanmiyur
| Project | Distance | From | Homes | Possession |
|---|---|---|---|---|
| Isha GeethanjaliIsha Homes · LB Road, Thiruvanmiyur3 BHK · Feb 2031 | 0.6 km | ₹2.23 Cr | 3 BHK | Feb 2031 |
| Ramaniyam SabariRamaniyam · Teynampet / T Nagar3 BHK · Dec 2030 | 1.3 km | ₹3.75 Cr | 3 BHK | Dec 2030 |
| Ramaniyam AnantiyaRamaniyam · Adyar2 and 3 BHK · Dec 2029 | 1.6 km | On request | 2 and 3 BHK | Dec 2029 |
| Rajparis Blue JewelRajparis · Muttukadu3 BHK · Jan 2029 | 1.6 km | ₹1.59 Cr | 3 BHK | Jan 2029 |
| Sanna Reddy ShreyasSannareddy Homes · Besant Nagar3 and 4 BHK · Oct 2033 | 1.8 km | ₹4.13 Cr | 3 and 4 BHK | Oct 2033 |
| Tulive RosendaleTulive · Besant Nagar4 BHK · Dec 2029 | 1.8 km | ₹6.8 Cr | 4 BHK | Dec 2029 |
The station
Line and status
- Purple Line (Corridor 3)Under construction
- Madhavaram – Taramani (underground)Target 2028CMRL official, via TOI, Feb 2026; status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
