Property Point

Total Environment

After the Rain, Sir MVIT College Road, North Bengaluru (about 16 km from Kempegowda airport), Bengaluru

Available · Luxury

Indicative price

≈ ₹4.78 Cr – ₹8.02 Cr

Prices in
Choose a residence

Size

3,184 sq.ft

Price

≈ ₹4.78 Cr – ₹5.18 Cr

CallWhatsApp

RERA listed · Zero brokerage

Last updated

Prices verified 14 Oct 2026Verify on K-RERA ↗Total Environment: 40 projects delivered since 1996, per the developer

Possession
Apr 2032
Sizes
3,184 – 5,120 sq.ft
Type
Villa
Tier
Luxury

Prices as of · indicative, from dated listings

Availability · checked October 2026

Available

Overview

After the Rain by Total Environment is a luxury villa project in Sir MVIT College Road, North Bengaluru (about 16 km from Kempegowda airport), Bengaluru, offering 3 BHK, 4 BHK priced ≈ ₹4.78 Cr – ₹8.02 Cr. Possession is Apr 2032 (under construction), registered with RERA in 5 phases.

Best for a family that wants a house rather than a flat, and can work from North Bengaluru or travel to the airport often (3 BHK, about 3,200 sq ft).

After the Rain is a villa community by Total Environment in Sir MVIT College Road, North Bengaluru (about 16 km from Kempegowda airport), Bengaluru. It is registered with Karnataka RERA across 5 registrations, first registered in October 2017. The completion date currently on RERA is April 2032. Building plans were approved by BDA.

  • RERA completion: April 2032
  • Plan approved by BDA

After the Rain price list.

Floor plans, sizes and prices.

3 BHK from ₹4.78 Cr and 4 BHK from ₹8.02 Cr (indicative, from dated listings), as checked on 30 October 2026.

3 BHK

Saleable area
3,184 sq.ft
Price
≈ ₹4.78 Cr – ₹5.18 Cr

4 BHK

Saleable area
5,120 sq.ft
Price
≈ From ₹8.02 Cr

Indicative prices from recent listings and price sheets, checked October 2026. The builder does not publish a price list; an advisor can confirm today's price for a specific home.

Listed price history: ₹4.99 Cr – ₹6.5 Cr on 14 Nov 2026 → ₹4.99 Cr – ₹6.5 Cr on 15 Nov 2026 → ₹4.99 Cr – ₹6.5 Cr on 16 Nov 2026 → ₹4.78 Cr – ₹8.02 Cr on 17 Nov 2026.

Price & availability checked October 2026

After the Rain all-inclusive cost.

Price, GST, stamp duty and registration.

A 3 BHK listed at ₹4.78 Cr comes to about ₹5.14 Cr with stamp duty and registration, on our arithmetic.

3 BHK

3,184 sq ft

Listed price
≈ ₹4.78 Cr
GST
Nil
Stamp duty & registration
₹36.33 L
Estimated total
≈ ₹5.14 Cr

GST: Nil, completed home

4 BHK

5,120 sq ft

Listed price
≈ ₹8.02 Cr
GST
Nil
Stamp duty & registration
₹60.95 L
Estimated total
≈ ₹8.63 Cr

GST: Nil, completed home

Worked out on the lowest listed price of each plan. Stamp duty 5% with cess and surcharge (5.6%), plus 2% registration. Duty is charged on the higher of the price and the government's guidance value. Car parking, preferred-location charges, maintenance deposits and other builder charges vary by home and are not included; ask for the cost sheet. Sources: stamp duty and registration rules · GST notification 03/2019.

After the Rain review 2026.

Pros and cons, from the record.

In its favour

Worth weighing

Drawn only from public records and our dated checks, with the source under each point. Distances are in a straight line unless marked by road.

Our take

Should you buy After the Rain?

A large-format villa community north of Yelahanka, with early phases completed and a 36-villa Phase III registered to April 2032, listed from about ₹4.8 Cr.

Shabeer Mohammed · Property Expert, Bangalore

Reviewed

Is the price fair?

Total Environment publishes no price list. Undated portal listings put a 3 BHK of about 3,200–3,300 sq ft near ₹4.8–5.2 Cr, and a 4 BHK of 5,120 sq ft near ₹7.7–8 Cr. That works out to about ₹15,000 per sq ft. The listings do not say which phase they refer to.

We do not set this against our area median, which is built from flats. In our view a villa here is better compared on land, built-up area and specification with other villas in North Bengaluru. Its pricing reflects a lifestyle choice more than a value purchase, so compare it with other launches on the same terms. Ask for the all-in cost sheet, with GST where it applies, stamp duty, registration and any club or infrastructure charges.

Who it suits

  • 3 BHK (about 3,200 sq ft): a family that wants a house rather than a flat, and can work from North Bengaluru or travel to the airport often.
  • 4 BHK (5,120 sq ft): a large or multi-generational family that wants room for each household.
  • Phase III buyers: those happy to pay in stages for a home with completion registered for April 2032.
  • Buyers of a finished home: look for a resale in the earlier phases, where you can judge the build and the neighbourhood first.

Before you visit

  • Find out which of the five phases the home belongs to. Our record lists Phase 1, IIA, IIB, IIC and III, each with its own registration.
  • For Phase III, check PRM/KA/RERA/1251/309/PR/160825/008002 on the Karnataka RERA site. It covers 36 villas at Bettahalasuru village, with completion on 30 April 2032.
  • For a finished home, ask to see the occupancy certificate for that block. RERA records one for Phase 1, dated 30 April 2022. Do not assume it covers later phases.
  • Ask for the carpet area, the plot or land share, and the exact block.
  • Ask which banks have approved your phase. We could not confirm a lender from the published lists we checked.
  • Drive it at your usual hour. Ola Maps showed about 25 minutes to the airport and about 86 minutes to MG Road.

How to book

  • New home: pay the booking amount against a receipt naming the villa, then receive the allotment letter.
  • Sign and register the agreement for sale, then arrange the loan with a bank that has approved the phase.
  • Pay in stages. The Phase III draft filed on RERA shows 5% on booking, 10% advance, 20% on foundation, 15% on each of the first, second and third SSL stages, 10% on internal plastering, 5% on flooring and 5% on virtual completion. Current offers may differ.
  • Resale home: pay a token, get the bank's valuation, sign the sale agreement, then register the sale deed.

Our verdict

As of October 2026, After the Rain suits a family that wants a large house in North Bengaluru near the airport, and values space and design over a short commute to the city centre. Phase III is for a buyer who can wait until 2032. If you want to move in sooner, look at resale homes in the earlier phases, with the occupancy certificate in hand.

After the Rain possession date.

Completed, on the RERA register.

Completed, on the Karnataka RERA register. Possession is listed as Apr 2032.

Possession, as listed
Apr 2032
Registration
PRM/KA/RERA/1251/309/PR/171014/000483
Completed
30 Apr 2022

Source: Karnataka RERA. Progress is the developer's own filing; a site visit shows where each tower stands.

After the Rain specifications.

RERA, possession and every figure.

Possession

Apr 2032

Under Construction

Configurations

3 BHK, 4 BHK

Villa

Size range
3,184 – 5,120 sq.ft
RERA
PRM/KA/RERA/1251/309/PR/160825/008002, PRM/KA/RERA/1251/309/PR/300322/004795, PRM/KA/RERA/1251/309/PR/191015/002923, PRM/KA/RERA/1251/309/PR/180519/001763, PRM/KA/RERA/1251/309/PR/171014/000483
In context

After the Rain price per sq ft

After the Rain
₹15,641 per sq ftWorked out from the lowest listed price and size.

Sources: Property Point listings (developer information, indicative, November 2026)

From the regulator

After the Rain RERA record

Dates and approvals as filed on Karnataka RERA.

Registration number
PRM/KA/RERA/1251/309/PR/171014/000483 Karnataka RERA · registered as “After the Rain- Phase 1”
Registered on
14 Oct 2017
Completion promised at registration
30 Jun 2019
Current completion date on RERA
30 Apr 2022
Status on RERA
First occupancy certificate 30 Apr 2022
Plan approval
BDA - Bangalore Development Authority

As filed by the builder on Karnataka RERA, checked 28 Oct 2026. Verify on the regulator's site before you commit to After the Rain.

After the Rain location.

Connectivity, nearby places and EMI.

About 25 min to Airport (16 km), 109 min to Whitefield / ITPL (36 km) and 86 min to MG Road (25 km) by road, on Ola Maps (28 October 2026).

After the Rain

Sir MVIT College Road, North Bengaluru (about 16 km from Kempegowda airport), Bengaluru · North Bengaluru

Open in Maps
Loading map…

Connectivity

25min

to Airport · 16 km

109min

to Whitefield / ITPL · 36 km

86min

to MG Road · 25 km

136min

to Electronic City · 43 km

What's nearby

Metro & transit
  • Bagalur Cross Bus Stop4.0 km
  • Kogilu Cross5.9 km
  • Yelahanka Old Town6.3 km
Schools & colleges
  • Vidyashilp Academy3.0 km
  • Kendriya Vidyalaya Air Force Station Yelahanka3.4 km
  • Air Force School, Yelahanka3.6 km
Hospitals
  • RJR Hospital3.0 km
  • Anupamaa Hospital7.2 km
  • M& M Health Care7.4 km
Shopping & malls
  • Kurlappa Shopping Complex5.9 km
  • Garuda Mall6.9 km
Dining
  • Andhra Vindu MultiCuisine Family Restaurant4.6 km
  • Santosh Punjabi Dhaba Pure Veg6.2 km
  • Maa Da Dhaba6.8 km

Nearby places and drive times are estimates from Ola Maps, measured 28 October 2026. Real times vary with traffic.

After the Rain vs nearby projects.

Price, rate and possession.
ProjectPricePer sq ftPossessionStatus
After the RainSir MVIT College Road, North Bengaluru (about 16 km from Kempegowda airport)From ₹4.78 Cr—Apr 2032Under Construction
Brigade InsigniaKogilu Cross, Yelahanka, North BengaluruFrom ₹3.99 Cr—Jun 2029Under Construction
Embassy EdenChapparkallu Road, Rajanukunte, YelahankaFrom ₹25 Cr—Dec 2031New Launch
Prestige WoodsideAvalahalli Village, near CRPF, Yelahanka New TownFrom ₹3.5 Cr₹10,000Ready to MoveReady to Move

Questions about After the Rain.

Price, possession and RERA.

What is the price of After the Rain?

After the Rain by Total Environment is priced ₹4.78 Cr – ₹8.02 Cr for 3 BHK, 4 BHK in Sir MVIT College Road, North Bengaluru (about 16 km from Kempegowda airport), Bengaluru. Request the latest price sheet and payment plan for the current, unit-specific pricing.

When is possession (handover) of After the Rain?

Possession (handover) of After the Rain is Apr 2032. Current status: Under Construction.

Where is After the Rain located?

After the Rain is at Sir MVIT College Road, North Bengaluru (about 16 km from Kempegowda airport), Bengaluru (North Bengaluru, Bengaluru). By road it is about 25 min to Airport (16 km), 109 min to Whitefield / ITPL (36 km), 86 min to MG Road (25 km), 136 min to Electronic City (43 km), measured on Ola Maps on 28 October 2026; real times vary with traffic.

What floor plans and configurations does After the Rain offer?

After the Rain offers 3 BHK (3,184 sq.ft), 4 BHK (5,120 sq.ft). Detailed floor plans for each configuration are available on request.

Show all 21 questions

What is the price per sq ft of After the Rain?

About ₹15,641 per sq ft, worked out from the lowest listed price and size.

What is near After the Rain?

Metro & transit: Bagalur Cross Bus Stop (4.0 km), Kogilu Cross (5.9 km). Schools & colleges: Vidyashilp Academy (3.0 km), Kendriya Vidyalaya Air Force Station Yelahanka (3.4 km). Hospitals: RJR Hospital (3.0 km), Anupamaa Hospital (7.2 km). Shopping & malls: Kurlappa Shopping Complex (5.9 km), Garuda Mall (6.9 km). Dining: Andhra Vindu MultiCuisine Family Restaurant (4.6 km), Santosh Punjabi Dhaba Pure Veg (6.2 km). Distances are straight-line estimates from Ola Maps, 28 October 2026.

How far is After the Rain from the airport?

About 16 km, roughly 25 minutes by road on Ola Maps (28 October 2026); allow more at peak hours.

What is the nearest metro or transit stop to After the Rain?

Ola Maps lists Bagalur Cross Bus Stop (4.0 km), Kogilu Cross (5.9 km), Yelahanka Old Town (6.3 km) as the nearest transit stops (28 October 2026). Check whether a stop is metro, rail or bus before relying on it.

What is the price of a 3 BHK in After the Rain?

A 3 BHK in After the Rain is listed at ₹4.78 Cr – ₹5.18 Cr for 3,184 sq.ft (saleable area), an indicative figure from dated listings. GST, stamp duty and registration are extra; the all-inclusive cost is worked out on this page.

What is the price of a 4 BHK in After the Rain?

A 4 BHK in After the Rain is listed at From ₹8.02 Cr for 5,120 sq.ft (saleable area), an indicative figure from dated listings. GST, stamp duty and registration are extra; the all-inclusive cost is worked out on this page.

Is After the Rain RERA registered?

Yes. After the Rain is registered with Karnataka RERA under PRM/KA/RERA/1251/309/PR/171014/000483, registered on 14 Oct 2017. The full record is on this page with a link to the regulator.

Is After the Rain a good investment?

We don't forecast returns. What the public record shows: About 16 km from the airport, roughly 25 minutes by road. Registered with Karnataka RERA under PRM/KA/RERA/1251/309/PR/171014/000483; the record is on this page. Ready to move: no wait for possession, and no GST on a completed home. The nearest open metro station, Peenya, is about 15.6 km away in a straight line. Whether it suits you depends on your budget, your timeline and whether you will live in it or let it out.

Who is the developer of After the Rain?

After the Rain is developed by Total Environment, a developer founded in 1996 and based in Bengaluru. Its other projects on Property Point include Total Environment The Magic Faraway Tree, Total Environment Learning To Fly, Total Environment A Few Honest Words.

Is After the Rain ready to move in?

Yes. After the Rain is a completed project on the Karnataka RERA register. Ask for the occupancy certificate before you pay a booking amount.

After the Rain or Brigade Insignia: how do they compare?

After the Rain (Sir MVIT College Road, North Bengaluru (about 16 km from Kempegowda airport)) is listed from ₹4.78 Cr, , with possession Apr 2032. Brigade Insignia (Kogilu Cross, Yelahanka, North Bengaluru) is listed from ₹3.99 Cr, with possession Jun 2029. Both pages carry the full price list and RERA record.

What is the payment plan for After the Rain?

Construction-linked plan: Phase III proforma agreement (clause 5.03): 5% on booking/EMD, 10% advance, 20% on foundation, 15% each on 1st, 2nd and 3rd SSL, 10% on internal plastering, 5% on flooring, 5% on virtual completion (dated 30-04-2032). Total 100%. (source: Agreement for sale filed by the developer on Karnataka RERA (Proforma Agreement for Sale ATR Phase III V3)). Plans can change between phases; confirm the current schedule before booking.

What is the down payment for After the Rain?

RBI caps a home loan at 75% of the property's value at this price (90% up to ₹30 lakh, 80% up to ₹75 lakh, 75% above). For the 3 BHK listed from ₹4.78 Cr, that means at least about ₹1.2 Cr from your own funds, plus stamp duty and registration of about ₹36.33 L, which banks do not finance. The payment plan on this page sets when each part falls due.

Who is After the Rain best for?

3 BHK (about 3,200 sq ft): a family that wants a house rather than a flat, and can work from North Bengaluru or travel to the airport often. 4 BHK (5,120 sq ft): a large or multi-generational family that wants room for each household. Phase III buyers: those happy to pay in stages for a home with completion registered for April 2032. Buyers of a finished home: look for a resale in the earlier phases, where you can judge the build and the neighbourhood first.

What is the total cost of After the Rain including GST and registration?

For the 3 BHK listed from ₹4.78 Cr: GST: nil, completed home, stamp duty and registration about ₹36.33 L, so about ₹5.14 Cr in all. Stamp duty 5% with cess and surcharge (5.6%), plus 2% registration. Parking, PLC, maintenance and other builder charges vary by unit and are not included.

How do I get the After the Rain brochure, floor plan and payment plan?

Use "Get the brochure" on this page or register your interest, and an advisor will share the After the Rain brochure, floor plans, master plan and latest payment plan as available from Total Environment. The sanctioned layout and specifications filed under RERA registration PRM/KA/RERA/1251/309/PR/171014/000483 are public on Karnataka RERA.

Where can I see the After the Rain master plan and layout plan?

On the RERA portal. Under the RERA Act 2016 (sections 4 and 11), a promoter files the sanctioned plan, layout plan and specifications with the regulator and publishes them on the project's page there: search registration PRM/KA/RERA/1251/309/PR/171014/000483 (After the Rain- Phase 1) on Karnataka RERA. The plan approval on the record is from BDA - Bangalore Development Authority. Sizes for each configuration are listed on this page.

About Total Environment.

Since 1996, Bengaluru.

By appointment

See After the Rain in person.

An advisor arranges the visit, the latest price sheet and floor plans from Total Environment. Zero brokerage.

You may also like.

Similar residences nearby.

More projects near Sir MVIT College Road

Indicative

≈ ₹4.78 Cr