The Bangalore Metropolitan Region Development Authority (BMRDA) has posted 'Proposed Draft Mobility Plans' (road-network maps) for nine planning areas around Bengaluru on its website. The files are dated 29 September 2026, the day Bengaluru Development Minister Krishna Byre Gowda announced a road grid for Bengaluru Urban areas outside the Greater Bengaluru Authority (GBA). He said land on the notified roads must be kept vacant when layouts or houses are built (ThePrint/PTI, 29 September 2026). Separately, BWSSB, which now covers the whole Bengaluru Urban district, is preparing a water and drainage master plan for it.

Updated 8 November 2026. We opened the BMRDA home page and checked the date stamps on the map files, and re-read the September and October reports. We found no later notice changing the grid. For the separate GBA road-map objection window inside city limits, see Bengaluru Road Circulation Map 2026: Check Your Plot, Object.

The nine draft mobility plans on the BMRDA site

Listed on bmrda.karnataka.gov.in under 'Proposed Draft Mobility Plans', as we found them on 8 November 2026. File sizes are from the server.

  • Anekal Planning Authority — whole local planning area circulation map — about 4.6 MB.
  • Bengaluru International Airport Area Planning Authority (BIAAPA) — signed mobility plan — about 132 MB.
  • Channapatna Planning Authority — mobility plan.
  • Doddaballapur Planning Authority — mobility plan.
  • Kanakapura Planning Authority — overall map.
  • Magadi Planning Authority — whole local planning area map.
  • Nelamangala Planning Authority — mobility plan.
  • Ramanagara Urban Development Authority — mobility plan.
  • Satellite Town Ring Road Planning Authority — mobility plan — about 42 MB.

What the minister said the grid does

  • Roads link taluk and hobli headquarters, major district roads, state highways, the Peripheral Ring Road and the Satellite Town Ring Road, notified as CDP roads in a grid.
  • Widths: roads as narrow as 10 m are now notified at 30 m, 45 m and in some cases 90 m.
  • Land inside the notified corridors must stay vacant when layouts or houses are built; building on it would violate the law.
  • Building the full network could take five to ten years, in phases by priority.
  • BMRDA, zilla panchayat and PWD officials are to identify the roads jointly and display details on gram panchayat and revenue office notice boards; videos of existing and proposed alignments are to be uploaded.

Water and sewerage beyond the GBA

  • The whole Bengaluru Urban district has been brought under BWSSB, and a master plan is being prepared for drinking water and, step by step, drainage (ThePrint/PTI and The Hans India, 29-30 September 2026).
  • At a Bengaluru Metropolitan Region advisory meeting on 5 October 2026, the government projected the region's water need at about 3,600 MLD by 2037 and said BWSSB coverage of the district would be phased (ThePrint/PTI, 5 October 2026).
  • No BWSSB master plan document has been published yet. For the areas BWSSB has taken over, see BWSSB New Areas 2026: Sarjapur, Anekal, Jigani Water Explained.

What is not decided

  • BMRDA labels the maps 'proposed draft'. We found no published final approval, and no public objection procedure was described in the reports.
  • No Hoskote Planning Authority mobility plan was on the list when we checked, although Hoskote appears elsewhere on the BMRDA site.
  • Channapatna, Kanakapura, Magadi and Ramanagara are in Bengaluru South district, not Bengaluru Urban. The site groups all nine together; the reports describe the grid as covering Bengaluru Urban areas outside the GBA. Ask the planning authority which notification applies to your village.
  • No compensation method for land on future roads was announced with the grid.

What to do now

  • 1. Find which planning authority covers your village (Anekal, BIAAPA, Nelamangala and so on) and open that map on the BMRDA site. The larger files may be slow on a phone.
  • 2. Locate your survey number against the roads drawn on the map. If the scale makes it unclear, take your survey sketch to the planning authority's town planning section and ask in writing whether a notified road crosses it, and at what width.
  • 3. Do not buy a plot, or start building, on land that falls inside a notified corridor until you have that answer in writing.
  • 4. Check gram panchayat and revenue office notice boards for the local road list, as the minister directed.
  • 5. For plotted projects, ask the developer for the planning authority's approved layout and check that it matches the road map. RERA-registered layouts: Plots, Bangalore.
  • 6. For the larger ring roads these grids connect to, see STRR Road Map and Status: Hoskote–Hosur by December 2026.