The Madhavaram to Sholinganallur metro route is Chennai Metro's Red Line (Corridor 5 of Phase 2): about 44.6 km via Kolathur, Villivakkam, Koyambedu, the Arcot Road double-decker, Alandur, Madipakkam and Medavakkam. None of it carries passengers yet. Trials on Koyambedu to Chennai Trade Centre are expected by end-November 2026 (Metro Rail News, 11 October 2026); Wikipedia's station table shows Koyambedu to Alandur for March 2027, St Thomas Mount to Sholinganallur for December 2027 and the Madhavaram end for December 2028.
Updated 3 November 2026. We rechecked the sources on 3 November: we found no report yet that the Koyambedu trials have started, and Wikipedia's station table now gives March 2027 for the Koyambedu to Alandur section. We removed projects that are no longer available on our listings. For the Poonamallee–Vadapalani stretch, open since 11 October 2026 and running 6 am to 9 pm since 23 October (DT Next, 21 October 2026), see Porur, Poonamallee Metro Opening Date & Stations (Nov 2026)
Homes on our listings along the route include Radiance Solitaire, Appaswamy Skylon, Casagrand Elysium and Purva Windermere.
How long is the Red Line and how many stations?
Metro Rail Today reported in June 2023 that CMRL cut Corridor 5 from 47 km to 44.6 km, with 44 stations. Wikipedia's Red Line page still shows the earlier 47 km and 45 stations, of which it lists 41.2 km as elevated and 5.8 km underground. The underground part is the Kolathur to Villivakkam stretch in the north.
Its most unusual feature is the double-decker section on Arcot Road, shared with the Yellow Line. DT Next reported in July 2024 that four stations there (Alwarthirunagar, Valasaravakkam, Karambakkam and Alapakkam) are built at two levels, with both lines on the same piers, which it described as a first in India. Those four will be interchanges between Corridors 4 and 5. More on why they are not yet open: Is Valasaravakkam Metro Open? Opening Date (Nov 2026)
What are the Red Line stations?
From Wikipedia's station table, grouped into the three sections that are being opened at different times. Station names may differ slightly after the 2023 revision and on final CMRL signage.
- North (Madhavaram to Anna Nagar): Madhavaram Milk Colony, Madhavaram Depot, Assisi Nagar, Manjambakkam, Velmurugan Nagar, Madhavaram Bus Terminus, Sastri Nagar, Retteri Junction, Kolathur Junction, Srinivasa Nagar, Villivakkam, Villivakkam Bus Terminus, Villivakkam CTH Road, Anna Nagar West, Thirumangalam, Anna Nagar KV.
- Centre-west (Koyambedu to Alandur): Koyambedu, Koyambedu Market, Natesan Nagar, Virugambakkam, Alwarthirunagar, Valasaravakkam, Karambakkam, Alapakkam Junction, Mugalivakkam, Ramapuram, Manapakkam, Chennai Trade Centre, Butt Road, Alandur.
- South (St Thomas Mount to Sholinganallur): St Thomas Mount, Adambakkam, Vanuvampet, Ullagaram, Madipakkam, Kilkattalai, Echangadu, Kovilambakkam, Vellakkal, Medavakkam I, Medavakkam II, Perumbakkam, Classical Tamil Institute, Elcot, Sholinganallur.
When does the Red Line open? The trial run and section dates
Koyambedu to Chennai Trade Centre comes first. Construction World reported on 8 September 2026 that CMRL is targeting a trial run in November 2026, with tests expected to continue for about four months before commercial operations. About 1.5 km of track work remained, including roughly 300 metres on the double-decker section and 150 metres at Koyambedu station. The same report said extending to Alandur, which involves a 3.6 km parcel largely along Butt Road, could take another 45 to 60 days, and that Koyambedu to Alandur is unlikely to open before next year and could be commissioned in the first quarter.
Earlier targets were set for mid-2026. Swarajya reported in January 2026 that CMRL was working to bring the 12 km, 13-station Koyambedu to Butt Road stretch forward from June 2027 to mid-2026, and Propspedia (September 2026) refers to a June 2026 plan to open up to Alandur. No passenger opening date has been announced.
The latest report, Metro Rail News on 11 October 2026 (citing The New Indian Express), says track to Chennai Trade Centre is complete, Koyambedu to Chennai Trade Centre trials are expected by end-November 2026, and Alandur trials about two months after that.
Wikipedia's station table (rechecked 3 November 2026) shows Koyambedu to Alandur for March 2027, the southern section, St Thomas Mount to Sholinganallur, for December 2027, and the northern section, Madhavaram to Anna Nagar, for December 2028. A CMRL official quoted by the Times of India (via Swarajya, 8 February 2026) targeted Phase 2's elevated corridors, which include the southern section, for about March 2027 and the underground stretches for 2028. Treat all of these as indicative.
Which localities does the Red Line serve?
- Madhavaram, Kolathur and Villivakkam in the north, with the underground run under Kolathur and Villivakkam. Guides: Madhavaram, Chennai: Buyer's Guide 2026 — Prices, Rents, Metro Phase 2, Projects and Risks and Kolathur, Chennai: Buyer's Guide 2026 — Prices, Metro Phase 2, Projects and Risks
- Anna Nagar West, Koyambedu and Virugambakkam. Guide: Virugambakkam, Chennai: Buyer's Guide 2026 — Prices, Metro Phase 2, Projects and Risks
- The Arcot Road double-decker belt (Valasaravakkam, Alapakkam), then Ramapuram and Manapakkam. Guides: Ramapuram, Chennai: Buyer's Guide 2026 — Prices, Metro Phase 2, Projects and Risks and Manapakkam, Chennai: Buyer's Guide 2026 — Prices, Metro Phase 2, Projects and Risks
- Alandur, Madipakkam, Kovilambakkam and Medavakkam in the south. Guides: Madipakkam, Chennai: Buyer's Guide 2026 — Prices, Metro, Projects and Risks, Kovilambakkam Nearest Metro Station and Location (Nov 2026) and Medavakkam, Chennai: Buyer's Guide 2026 — Prices, Metro, Projects and Risks
- Perumbakkam and Sholinganallur at the southern end, where the line meets the Purple Line. See Purple Line Metro Chennai: Stations, Completion (Nov 2026)
Catalogue homes near the Red Line
Grouped by the locality in each listing. We have not measured distances to stations. Prices are indicative and change with the developer's price sheet.
Madhavaram: Radiance Solitaire, 2 to 4 BHK, ₹0.64 to 1.95 crore, possession listed June 2028 (Radiance Solitaire). Urbanrise The Lakes Edge, ₹0.85 to 1.47 crore, September 2028 (Urbanrise The Lakes Edge). Casagrand Aquagrove, ₹1.04 to 2.12 crore, May 2029 (Casagrand Aquagrove). Prestige Palm Court, 1 to 3 BHK, ₹0.67 to 1.99 crore, December 2030 (Prestige Palm Court). Radiance Suprema on GNT Road is ready to move from ₹0.45 crore (Radiance Suprema).
Koyambedu: Appaswamy Skylon, 3 and 4 BHK, ₹2.85 to 4.15 crore, December 2027 (Appaswamy Skylon). Shriram Stellar, ₹1.82 to 3.67 crore, October 2032 (Shriram Stellar).
Ramapuram and Manapakkam: Appaswamy The Broadstone, ready, ₹2.35 to 3.26 crore (Appaswamy The Broadstone). Casagrand Elysium, ₹0.80 to 1.14 crore, April 2028 (Casagrand Elysium). L&T Avinya Enclave Phase 2, ₹1.75 to 4.50 crore, September 2028 (L&T Avinya Enclave Phase 2).
Medavakkam: Purva Windermere, 1 to 3 BHK, ₹0.52 to 1.20 crore, December 2027 (Purva Windermere). Casagrand Cloud9, ₹0.65 to 1.12 crore, June 2027 (Casagrand Cloud9). TVS Emerald Udyana, 3 BHK, ₹1.23 to 1.54 crore, December 2028 (TVS Emerald Udyana). TVS Emerald Aaranya in Vengaivasal, near Medavakkam, ₹1.14 to 1.99 crore, November 2027 (TVS Emerald Aaranya).
Perumbakkam and Sholinganallur: Brigade Morgan Heights, ₹1.25 to 3.00 crore, December 2029 (Brigade Morgan Heights). Casagrand FirstCity, ready, 2 BHK, ₹0.60 to 0.69 crore (Casagrand FirstCity). Sholinganallur projects are listed in the Purple Line article.
What this means for buyers
- The centre-west section, through Koyambedu, Valasaravakkam, Ramapuram and Manapakkam, is the nearest to service. Early 2027 is a reasonable working assumption, not a commitment.
- In the south, Medavakkam and Kovilambakkam have a longer wait. Buy there for today's road access to the airport, Velachery and OMR, with the metro as a later benefit.
- The northern underground section is the furthest out. Madhavaram buyers will see the Purple and Red lines arrive at the same terminus, but on a 2028 horizon in the sources we found.
- Check how close the specific station is, and whether it is elevated over a busy road; noise and construction disruption near the line are real costs for a few years.