Gurugram has one working metro interchange today, Sikanderpur, where the Yellow Line meets the Rapid Metro. Plans published up to November 2026 add at least eight more points where lines would meet, the biggest being IFFCO Chowk, named on three plans: the Yellow Line, the Delhi-Gurugram-Bawal Namo Bharat and the Gurugram-Faridabad Namo Bharat, with the draft airport metro also stopping there.
Updated 8 November 2026. For each point we give the lines involved, the stage of each line and whether a source says 'interchange' or the two plans simply share a station name. Only one of the new lines, the Millennium City Centre-Cyber City loop, is being built.
Gurgaon metro interchange stations list
- 1. Sikanderpur: Yellow Line + Rapid Metro. Working. The Rapid Metro carried 88.81 lakh passengers from April to August 2026, up 11.62% (ThePrint/PTI, 8 October 2026).
- 2. IFFCO Chowk: Yellow Line (working) + Delhi-Gurugram-Bawal Namo Bharat (elevated station; Urban Acres, 29 September 2026) + Gurugram-Faridabad Namo Bharat, which starts here as an RRTS interchange (Swarajya, 21 March 2026) + draft airport metro station (The Tribune, 27 July 2026).
- 3. Cyber City: Rapid Metro (working) + Phase 2 of the new loop, terminal station (tendered; Construction World, 9 October 2026) + Namo Bharat underground station (Urban Acres). The Phase 2 tender says the line will offer interchanges with the Rapid Metro and the Namo Bharat corridor (Swarajya, 1 October 2026).
- 4. Millennium City Centre: Yellow Line terminal (working) + Phase 1 of the new loop (under construction, about 15% done; Swarajya, 6 October 2026) + a Gurugram-Faridabad Namo Bharat metro station (Swarajya, 21 March 2026).
- 5. Rajiv Chowk: Namo Bharat underground station (Urban Acres) + draft airport metro terminal (The Tribune, 27 July 2026). Whether the two would share a concourse has not been published.
- 6. Between Sectors 58 and 61: a Gurugram-Faridabad corridor station that 'will integrate with Rapid Metro' (Swarajya, 21 March 2026).
- 7. Sector 61: Gurugram-Faridabad corridor station planned as an interchange with the proposed Sector 56-Panchgaon metro (Swarajya, 21 March 2026).
- 8. Panchgaon: Sector 56-Panchgaon metro (35.25 km, 28 stations, in the final stages of approval) links with the Namo Bharat here (ThePrint/PTI, 8 October 2026); Panchgaon is an elevated Namo Bharat station (Urban Acres).
- 9. Hero Honda Chowk: named on two plans, the new loop's Phase 1 (India TV, 7 July 2025) and the Namo Bharat (underground; Urban Acres). No source we opened calls it an interchange.
Status of each line, November 2026
- Yellow Line and Rapid Metro: working.
- Millennium City Centre-Cyber City loop: Phase 1 under construction; Phase 2 civil tender out, bids 9–18 November 2026, 30 months from award (Construction World, 9 October 2026).
- Delhi-Gurugram-Bawal Namo Bharat: Haryana added the corridor's stations to its transit-oriented development policy, with a 1.5 km TOD zone around each (Urban Acres, 29 September 2026). Gurugram stations: Cyber City, IFFCO Chowk, Rajiv Chowk, Hero Honda Chowk, Kherki Daula (proposed), Manesar, Panchgaon and Bilaspur. Details: Delhi Gurgaon Alwar RRTS 2026: Route, Status, Stations
- Gurugram-Faridabad-Noida Namo Bharat: alignment and stations finalised at state level; DPR sent to departments for comments (ThePrint/PTI, 8 October 2026). Details: Namo Bharat Gurgaon to Noida 2026: Route, Stations, Status
- Airport metro, Yashobhoomi to Rajiv Chowk: 20 km, fully underground, about ₹13,500 crore; stations Bijwasan, Kapashera, Sector 22, IFFCO Chowk and Rajiv Chowk; merged draft DPR with HMRTC, final decision with the Union housing ministry (The Tribune, 27 July 2026).
- Sector 56-Panchgaon metro: final stages of approval (ThePrint/PTI, 8 October 2026). Details: Sector 56 to Panchgaon Metro 2026: Route, 28 Stations, Status
Same name, not yet an interchange
Two names appear on separate plans without a published interchange. Sector 22 is both a Phase 2 loop station and a draft airport-metro station. Hero Honda Chowk is on the loop's Phase 1 and the Namo Bharat. Until a DPR shows a shared or linked station, treat these as two stations with the same name, possibly some distance apart.
Registered homes near the interchange points
- IFFCO Chowk: Lodha Golf Course Road, Sector 28, GGM/1090/822/2026/62 (registered completion 30 Nov 2032); Ananta Vilasa 2.0, Sector 28, GGM/947/679/2025/50 (31 Jul 2031); about 1.1 km.
- Sikanderpur: M3M Jewel, Sector 25, GGM/722/454/2023/66 (29 Mar 2027), about 1.1 km.
- Millennium City Centre: Godrej Miraya, Sector 43, GGM/870/602/2024/97 (30 Sep 2031), about 1.4 km — see Godrej Miraya.
- Sectors 58–61: Three Sixty North Towers A–G, Sector 58, GGM/1069/801/2026/41 onwards (31 Dec 2033) — see Oberoi Three Sixty North.
- Distances run from sector centre to station, straight line. Every registered project measured against every station: Gurgaon Projects Near Metro: 18 of 352 Within 1 km (2026)
What this means for buyers
- Only Sikanderpur works today. Every other point depends on at least one line that is not yet built or approved.
- Namo Bharat TOD zones extend 1.5 km around each station; see TOD Zone Gurugram 2026: 1.5 km Namo Bharat Rules for Buyers.
- Ask which line and which stage a project's 'interchange' claim refers to, and check the date of the plan.
