Nine Gurugram junctions have a dated fix or study on the table as of 8 November 2026. The longest published wait is at Ambedkar Chowk on Sohna Road, where a traffic police survey found an average wait of 15 minutes (The Tribune, 6 May 2024); a flyover there was approved on 3 November 2026. Dadi Sati Chowk near the Dwarka Expressway carried about 9,400 passenger car units (PCU) a day, and the Hero Honda Chowk corridor 70,000 to 80,000 vehicles a day.

Updated 8 November 2026. There is no official ranked list of Gurugram's most congested junctions, so this list includes only junctions with a published traffic figure or a dated government decision. For each, we checked the HARERA register for active residential registrations within 1.5 km. Note: the 'Google Maps junction pilot' cited in some coverage is the Gurugram Police and Google Maps accident-alert system announced on 8 November 2025, covering 129 roads; it is not a congestion ranking (ThePrint/PTI).

Gurgaon traffic junctions list, November 2026

  • 1. Ambedkar Chowk, Sohna Road (Sectors 45/46–51/52): average wait 15 minutes in a traffic police survey (The Tribune, 6 May 2024); about 6,100 PCU at peak hour (Swarajya, 2 August 2025). Fix: ₹36.36 crore, about 930 m four-lane flyover, approved 3 November 2026, 18 months after award (GKToday, 3 November 2026).
  • 2. Dadi Sati Chowk (Sectors 85/86–89/90): about 9,400 PCU a day, expected to pass 10,000 (Swarajya, 2 August 2025). Fix: ₹43.05 crore, about 840 m six-lane flyover, approved 3 November 2026.
  • 3. Millennium City Centre / Z Chowk: ₹57 crore underpass with a covered foot overbridge, approved 3 November 2026 (GKToday).
  • 4. IFFCO Chowk, NH-48 and MG Road: GMDA plans to redevelop the junction with NHAI and may hire a traffic expert to study traffic and pedestrian movement (Construction World, 1 October 2026).
  • 5. Sikanderpur, MG Road: GMDA is examining an underpass or elevated corridor; a traffic consultant's assessment and a DPR come first (Construction World, 1 October 2026).
  • 6. Shankar Chowk and Moulsari Avenue, NH-48 at Cyber City: NHAI in-principle approval for a three-lane flyover from the Ambience Mall U-turn towards Cyber City and a three-lane underpass from Moulsari Avenue towards Delhi; DLF to fund and build, about ₹130–140 crore (Construction World, 8 October 2026).
  • 7. Hero Honda Chowk to Umang Bhardwaj Chowk: 70,000–80,000 vehicles a day; 2.25 km elevated road approved 1 October 2026, GMDA to prepare a fresh DPR (Swarajya, 2 October 2026).
  • 8. Vatika Chowk and the SPR junctions (Sectors 69–75A): GMDA studies say seven junctions need grade separation within a decade as hourly traffic is projected to cross 10,000 PCU; ₹776 crore elevated road out to tender, bids close 18 November 2026 (Swarajya, 3 October 2026).
  • 9. Bakhtawar Chowk, Sohna Road (Sectors 39/40/46/47): a double-decker flyover and metro viaduct with a station is planned; GMRL sent a revised design on 1 October and GMDA has sought further changes (Metro Rail News, 23 October 2026). Full story: Bakhtawar Chowk Flyover Gurugram: Double-Decker Metro Plan 2026

Which registered homes are within 1.5 km of these junctions?

Active residential HARERA registrations whose sector centre is within 1.5 km of the junction (straight line). Registered completion date in brackets.

  • Ambedkar Chowk: The Dualis, Sector 46, GGM/939/671/2025/42 (31 Dec 2031), 0.9 km; Orchid Ivy, Sector 51, GGM/597/329/2022/72, and Orchid Ivy-2, GGM/646/378/2022/121 (both 31 Dec 2026), 0.9 km.
  • Dadi Sati Chowk (junction placed at the midpoint of Sectors 85, 86, 89 and 90): SS Camasa, Sector 90, GGM/881/613/2024/108 (30 Sep 2031), see SS Camasa; Godrej Air Phases I–IV, Sector 85, GGM/300/2018/32 to GGM/303/2018/35 (2027), see Godrej Air; Anantam, Sector 85, GGM/829/561/2024/56 (21 Oct 2028); Serenity Hills Phases 1 and 2, Sector 86, GGM/993/725/2025/96 and /97 (30 Sep 2032), see Emaar Serenity Hills. 38 registrations in all fall within 1.5 km.
  • Millennium City Centre: Godrej Miraya, Sector 43, GGM/870/602/2024/97 (30 Sep 2031); The Empire, Sector 43, GGM/750/482/2023/94 (21 Aug 2028); 1.4 km.
  • IFFCO Chowk: Lodha Golf Course Road, Sector 28, GGM/1090/822/2026/62 (30 Nov 2032); Ananta Vilasa 2.0, Sector 28, GGM/947/679/2025/50 (31 Jul 2031); 1.1 km.
  • Sikanderpur: M3M Jewel, Sector 25, GGM/722/454/2023/66 (29 Mar 2027), 1.1 km, plus the two Sector 28 projects at 1.4 km.
  • Bakhtawar Chowk: Godrej Alira, Sector 39, GGM/959/691/2025/62 (30 Apr 2032), 0.5 km, see Godrej Alira; The Dualis, Sector 46, 0.6 km.
  • SPR (Sectors 69–75A): 25 active registrations; the full list is in SPR Elevated Road After 18 Nov 2026: What Happens Next.
  • Shankar Chowk and Hero Honda Chowk: no active residential registration within 1.5 km by our method.

What the published numbers do and do not tell you

The figures above come from different years and methods. Ambedkar Chowk's 15-minute wait is a 2024 traffic police survey; a later survey cited by Swarajya put peak waits above 10 minutes (22 November 2025). PCU counts weight vehicles by size (a car is 1 PCU, a bus more), so 6,100 PCU an hour at Ambedkar Chowk and 9,400 PCU a day at Dadi Sati Chowk measure different things and should not be compared directly.

For citywide context, TomTom's 2025 index for New Delhi gives 24 minutes per 10 km and 60.2% average congestion; it has no separate Gurugram figure. Our sector-to-office distances are in Gurgaon Commute to Cyber City: 40 Sectors Measured (2026).

How to use this list if you are buying

  • Check the stage: approved (Ambedkar, Dadi Sati, Millennium City Centre, Hero Honda Chowk), tendered (SPR), in-principle approval (Shankar Chowk), or study (IFFCO Chowk, Sikanderpur, Bakhtawar Chowk design).
  • Expect diversions during work. Approved flyovers run 18 months from award; the SPR road 30 months.
  • Drive your own route at 9 am and 6 pm before booking; our list covers junctions, not your whole trip.
  • Confirm the project's HRERA number and validity on haryanarera.gov.in.