Suncity Monarch Residences is a 900-apartment project of 3 and 4 BHK homes in Sector 78, New Gurgaon, registered with HARERA Gurugram on 22 January 2026 as GGM/1037/769/2026/09. Portal prices start at about ₹4.00 Cr for a 3 BHK and ₹5.36 Cr for a 4 BHK. HARERA carpet areas run from 1,149 to 1,744 sq ft, and the filed completion date is 31 March 2031.

Updated 3 November 2026. We read the HARERA registration page and project form, Suncity's project page and blog, the launch report and the ranking channel-partner pages. Suncity's project page did not load its details when we read it, so prices here are portal figures.

What is the Suncity Monarch price?

Our listing shows 3 BHK from ₹4.00 Cr and 4 BHK from ₹5.36 Cr (our listing, checked November 2026). Both are Square Yards asking prices for 2,350 and 3,150 sq ft of saleable area, plus charges, so treat them as approximate.

Other pages are close but not identical. Realtyhunting (9 August 2026) gives 3 BHK from about ₹3.99 Cr and 4 BHK from about ₹5.43 Cr. A channel-partner page lists 3 BHK at ₹3.995 to 4.16 Cr and 4 BHK at ₹5.43 to 5.67 Cr. It says these include two basement car parks, PLC, EDC and IDC, with GST and a ₹10 lakh club charge extra, and shows a limited-period 'inaugural benefit'. None of these is a Suncity price list, so ask Suncity for one in writing.

At ₹4.00 Cr for 2,350 sq ft saleable, the rate is about ₹17,000 per saleable sq ft (our arithmetic). Stamp duty and registration are on top; see Gurgaon stamp duty calculator.

Is Suncity Monarch Residences RERA-registered?

Yes. HARERA Gurugram's project page and form show:

  • Registration: GGM/1037/769/2026/09, dated 22 January 2026 (Project ID RERA-GRG-2100-2025)
  • Project name on HARERA: Suncity's Monarch Residences
  • Promoter: DVOK Buildcon LLP
  • Site: Sector 78, Village Shikopur, Gurugram
  • Land in this registration: 9.506 acres, within a total licensed area of 20.625 acres
  • DTCP licence: No. 121 of 2025, dated 17 July 2025, under NILP-2022
  • Proposed start: 1 January 2026. Proposed completion: 31 March 2031
  • Estimated project cost: ₹2,452.51 crore

Portals describe the project as 16 acres, and a launch report says 18 acres. Those may refer to the wider licensed land. HARERA's figure for this registration is 9.506 acres, so ask Suncity which land is in your phase.

When was Suncity Monarch launched?

HARERA's record shows the application was submitted on 18 December 2025 and the registration granted on 22 January 2026, with the certificate uploaded the same day. The proposed construction start in the form is 1 January 2026.

What are the carpet areas of the 3 BHK and 4 BHK?

HARERA's unit table lists 900 apartments in four sizes (converted from square metres by us):

  • 1,149 sq ft carpet — 16 apartments, across four towers
  • 1,333 sq ft carpet — 704 apartments, across four towers
  • 1,522 sq ft carpet — 4 apartments, in one tower
  • 1,744 sq ft carpet — 176 apartments, in one tower

Suncity does not publish which carpet size belongs to the 3 BHK and which to the 4 BHK, so ask for the floor plan of the exact unit. Confirm the carpet area of your unit in the agreement for sale.

The unit table spreads homes over four towers plus one, which matches the five towers in the launch coverage. The form does not give floor counts; a channel-partner payment plan refers to a 40th-floor slab.

What is the Suncity Monarch payment plan?

Suncity's pages do not publish a plan, and the two channel-partner versions differ. Realtyhunting describes a 10-70-20 plan: about 10% at booking, 70% during construction and 20% at possession. The other page shows a construction-linked plan: ₹10 to 15 lakh on booking, 10% on allotment, 20% within four months, then stages tied to the 10th and 40th floor slabs, flooring, glazing, the OC application (15%) and offer of possession (5%).

Get the plan from Suncity in writing. Under Section 13(1) of the RERA Act, no more than 10% of the cost can be taken before the agreement for sale is registered.

When is possession at Suncity Monarch?

The HARERA completion date is 31 March 2031, with a proposed start of 1 January 2026. Realtyhunting gives around December 2030 to 2031, and Houssed shows March 2032. Neither matches HARERA, so use 31 March 2031 for planning.

Where is Sector 78 and how is it connected?

HARERA places the project in Village Shikopur, Sector 78. Suncity's March 2026 blog says the site links to the Southern Peripheral Road, the Dwarka Expressway and NH-48, and through them to Cyber City, Udyog Vihar and Golf Course Extension Road, without giving distances. A channel-partner page claims 2 minutes to NH-48 and 30 minutes to IGI Airport. Those are marketing times, so drive the route at peak hour.

For the sector in detail, read Sector 78 Gurgaon (New Gurgaon): Buyer's Guide 2026 — Prices, Projects, Connectivity and see Sector 78 Gurgaon, Gurgaon and New Gurgaon, Gurgaon.

What amenities does Suncity list?

Suncity's blog lists a clubhouse with a fitness facility, indoor gaming areas, multipurpose spaces and lounges, plus jogging paths, swimming pools, yoga areas, landscaped gardens, children's play areas and open green zones. Channel-partner pages add a 'Monarch Club' and other features. Ask for the amenity list in the agreement or brochure.

Is there a Suncity Monarch brochure PDF?

Suncity's blog refers readers to the brochure for layouts, prices and payment options, but we found no direct download on the developer's site. Ask Suncity for the brochure and a dated price list. The approved plans and registration documents are on the HARERA project page.

What do Suncity Monarch reviews say?

The project was registered in January 2026 and its completion date is in 2031, so there are no resident reviews yet. We do not publish ratings. Instead, check the facts a review would test: the carpet area of your unit, the completion date in your agreement, the payment plan, and the developer's other completed projects in Gurgaon, which HARERA lists under the promoter's name.

Who is Suncity Monarch suited to?

On the filed facts, Monarch suits a buyer who wants a 3 BHK of about 1,333 sq ft carpet, or a 4 BHK of about 1,744 sq ft carpet, in a large community of 900 homes, and who can wait until March 2031. With 704 homes in one size, much of the resale stock will be the same size as yours, so the floor and the view of your unit matter when you sell.

If you want fewer neighbours, the Sector 80 launches below are smaller registrations. Ashiana Aaroham lists 3 BHK of 1,057 to 1,259 sq ft carpet with a developer price list, and Eldeco Terra & Sol has 224 homes in two towers.

What else is registered near Sector 78?

Eldeco Terra & Sol has a completion date two months earlier than Monarch's, at a lower portal price. Compare carpet areas: Eldeco lists 1,168 to 2,226 sq ft carpet. For the full list of 2026 registrations, see Pre-Launch Projects in Gurgaon 2026: RERA-Registered Only.

  • Aura The Aerth — Sector 79 — price on request — completion Apr 2033 — GGM/1076/808/2026/48. See Aura The Aerth
  • Eldeco Terra & Sol — Sector 80 — from ₹3.12 Cr (portal, approx) — completion Jan 2031 — GGM/1048/780/2026/20. See Eldeco Terra & Sol
  • Ashiana Aaroham — Sector 80 — from ₹3.49 Cr (developer) — completion Oct 2033 — GGM/1038/770/2026/10 and GGM/1014/746/2025/117. See Ashiana Aaroham
  • Trehan IRIS Omara — Sector 80 — from ₹6.95 Cr (portal, approx) — completion Dec 2032 — GGM/1036/768/2026/08. See Trehan IRIS Omara