Namma Metro · Yellow Line and Blue Line
Central Silk Board Metro Station: homes within 2 km
Central Silk Board is an interchange on the Yellow Line and Blue Line of Namma Metro in Bengaluru. The Yellow Line here has been open since 11 Aug 2025 (status checked 20 October 2026). The Blue Line here is under construction on the Central Silk Board – KR Puram (Phase 2A) stretch; target 2027 (March 2027 (minister, Deccan Herald, 18 Aug 2026); May 2027 in a later report; status checked 20 October 2026). None of the new-launch or under-construction projects we list is within 2 km of the station yet.
Within 2 km, nearest first
Homes near Central Silk Board
None of the new-launch or under-construction homes we list is within 2 km of Central Silk Board yet. The nearest stations below, or homes near every Namma Metro station.
The station
Lines and status
- Yellow LineOpen
- RV Road – BommasandraSince 11 Aug 2025Status checked 20 October 2026
- Blue LineUnder construction
- Central Silk Board – KR Puram (Phase 2A)Target 2027March 2027 (minister, Deccan Herald, 18 Aug 2026); May 2027 in a later report; status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
