Metro & property · Bengaluru
Namma Metro: live status, stations & timings
Our reporting on Namma Metro, line by line: what is open, what is under construction, and what each corridor means for the homes around its stations.
Status checked
The line
- Testing
- Being built
Station 1 of 18
Kalena Agrahara
Built · awaiting safety authorisation
Homes within 1 km
Line status
Checked
Pink Line, Bengaluru
Kalena Agrahara – Tavarekere (elevated)
7.5 km · 6 stations
Inspected by the Commissioner of Metro Rail Safety on 6–8 October. Passenger service starts once the authorisation is issued; no opening date has been announced.
Safety inspection
Target Late Oct or early Nov 2026Reported, Vartha Bharati, 18 Oct 2026
Dairy Circle – Nagawara (underground)
13.8 km · 12 stations
Track laid; trial runs expected in November–December.
Under construction
Target March 2027BMRCL, via Deccan Herald, 5 Oct 2026; May 2027 in a later report
Latest
The Chief Minister has invited the Prime Minister to open the elevated stretch; 1 November is under consideration. Vartha Bharati
BMRCL is answering the 36 observations from the safety inspection before authorisation. Deccan Herald
BMTC set out five feeder bus routes for the Pink Line stations: 30 buses, every 10 minutes. Deccan Herald
The line
- Being built
Station 6 of 28
Embassy TechVillage Devarabeesanahalli
Under construction
Homes within 1 km
Line status
Checked
Blue Line, Bengaluru
Central Silk Board – KR Puram (Phase 2A)
19.75 km · Outer Ring Road
Trial runs, KR Puram to Marathahalli first, now expected in November.
Under construction
Target 2027March 2027 (minister, Deccan Herald, 18 Aug 2026); May 2027 in a later report
Hebbal – Airport (Phase 2B)
27.4 km
Under construction
Target Not before Sept 2027Deccan Herald, 19 Aug 2026
KR Puram – Hebbal (Phase 2B)
11 km
Under construction
Target December 2027Deccan Herald, 19 Aug 2026
Latest
BMRCL is preparing trial runs from Byappanahalli depot to KR Puram and Marathahalli; all Phase 2A stations except Silk Board due to finish by November. Urban Acres
The line
- Open
Station 3 of 16
Jayadeva Hospital
Open
Change here for the Pink Line
Homes within 1 km
Line status
Checked
Yellow Line, Bengaluru
RV Road – Bommasandra
19.15 km · 16 stations
Every 7 minutes at weekday peak, 10 minutes off-peak and at weekends. First train 6 am (7 am on Sunday); last trains 11:55 pm from RV Road and 10:42 pm from Bommasandra. Confirm in the Namma Metro app.
Open
Since 11 Aug 2025
Latest
Services across the network ran until 1:30 am for the India–West Indies T20 match, a one-off extension. Deccan Herald
Station by station
Every station, and the homes within 2 km
Purple Line
open · 37 stations
- Whitefield (Kadugodi)
- Hopefarm Channasandra
- Kadugodi Tree Park
- Pattandur Agrahara
- Sri Sathya Sai Hospital
- Nallurhalli
- Kundalahalli
- Seetharampalya
- Hoodi
- Garudacharpalya
- Singayyanapalya
- Krishnarajapura (KR Puram)
- Benniganahalli
- Baiyappanahalli
- Swami Vivekananda Road
- Indiranagar
- Halasuru
- Trinity
- Mahatma Gandhi Road
- Cubbon Park
- Dr. B.R. Ambedkar Station, Vidhana Soudha
- Sir M. Visvesvaraya Station, Central College
- Nadaprabhu Kempegowda Station, Majestic
- Krantivira Sangolli Rayanna Railway Station
- Magadi Road
- Sri Balagangadharanatha Swamiji Station, Hosahalli
- Vijayanagara
- Attiguppe
- Deepanjali Nagar
- Mysuru Road
- Pantharapalya–Nayandahalli
- Rajarajeshwari Nagar
- Jnanabharathi
- Pattanagere
- Kengeri Bus Terminal
- Kengeri
- Challaghatta
Green Line
open · 32 stations
- Madavara
- Chikkabidarakallu
- Manjunath Nagar
- Nagasandra
- Dasarahalli
- Jalahalli
- Peenya Industry
- Peenya
- Goraguntepalya
- Yeshwanthpur
- Sandal Soap Factory
- Mahalakshmi
- Rajajinagara
- Mahakavi Kuvempu Road
- Srirampura
- Mantri Square Sampige Road
- Nadaprabhu Kempegowda Station, Majestic
- Chickpete
- Krishna Rajendra Market
- National College
- Lalbagh
- South End Circle
- Jayanagara
- Rashtreeya Vidyalaya Road
- Banashankari
- Jaya Prakash Nagar
- Yelachenahalli
- Konanakunte Cross
- Doddakallasandra
- Vajarahalli
- Thalaghattapura
- Silk Institute
Yellow Line
open · 16 stations
Pink Line
under construction · 18 stations
Blue Line
under construction · 28 stations
- Central Silk Board
- HSR Layout
- Agara
- Ibbaluru
- Prestige Bellanduru
- Embassy TechVillage Devarabeesanahalli
- Kadubeesanahalli
- Marathahalli
- ISRO
- Doddanekundi
- Bagmane Developers - DRDO Sports Complex
- Saraswathi Nagara
- Krishnarajapura (KR Puram)
- Kasturi Nagara
- Horamavu
- HRBR Layout
- Kalyana Nagara
- HBR Layout
- Nagawara
- Veerannapalya
- Hebbala
- Kodigehalli
- Jakkuru Cross
- Yelahanka
- Bagaluru Cross
- Doddajala
- Airport City
- KIAL Terminals
Our reporting, line by line
Pink Line
Kalena Agrahara to Nagawara, through Tavarekere and the Cantonment.
Yellow Line
RV Road to Bommasandra, along Hosur Road and Electronic City.
Blue Line
Silk Board to KR Puram along the Outer Ring Road, and on to the airport.
Red Line and Phase 3
Hebbal to Sarjapur, and the Orange and Grey lines of Phase 3.
- Red Line Metro Bangalore: Hebbal–Sarjapur Stations and 2033 DateThe Hebbal–Sarjapur Red Line was redesigned to cut its cost to ₹25,999 crore and pushed to April 2033, and it still awaits Union approval. The full station list, what changed in the revision, and how buyers along the route should price it.7 min
- Sarjapur Road Metro (Phase 3A, Red Line): What Is Actually Sanctioned in 2026The Hebbal–Sarjapur metro has Karnataka cabinet approval from December 2024 and a revised ₹25,999 crore plan sent to the Centre in April 2026, but it still awaits Union approval, with completion now reported for April 2033. Here is what is sanctioned, what is not, and what it means for buyers.9 min
- Namma Metro Phase 3: Orange and Grey Line Status and What Is Realistic for BuyersJP Nagar to Kempapura (Orange) and Hosahalli to Kadabagere (Grey) are the long-horizon metro bet on west and north-west Bengaluru. Tenders are out and ground work started in 2026, but the completion date has slid to 2031 to 2032.8 min
Suburban rail
K-RIDE's Mallige Line and the areas it serves.
Metro and prices
What the evidence says about homes near stations.
- Upcoming Bengaluru Metro Stations: How to Judge Homes Within 1 kmWhich stations open next, which neighbourhoods they serve, and a practical method to test whether a home is truly within walking reach of a metro entrance, using only station lists and dates that have been officially reported.9 min
- Does a Metro Really Raise Property Prices? The Evidence, and the Bengaluru CaveatsA Mumbai study found 13 to 17 percent gains within 1 km of the metro, and a 2025 Bengaluru study found proximity matters. Broker claims run far higher. We separate rigorous evidence from marketing and explain what it means for a buyer.8 min
- How Namma Metro's Expansion Is Re-Rating Bangalore PropertyNamma Metro is quietly redrawing where Bangalore's premium demand sits. Here is how a new line re-rates the property around it, and what a buyer should verify before paying the connectivity premium.8 min
- Ramamurthy Nagar & KR Puram Property Rates 2026: Reading the Metro EffectKR Puram is becoming an interchange between the Purple Line and the under-construction Blue Line, while Ramamurthy Nagar and Horamavu sit beside the Blue Line's airport alignment. We set out indicative rates, rents and what the metro is likely to do, and not do, to prices.10 min