Namma Metro · Blue Line
HRBR Layout Metro Station: homes within 2 km
HRBR Layout is on the Blue Line of Namma Metro in Bengaluru. The Blue Line here is under construction on the KR Puram – Hebbal (Phase 2B) stretch; target December 2027 (Deccan Herald, 19 Aug 2026; status checked 20 October 2026). None of the new-launch or under-construction projects we list is within 2 km of the station yet.
Within 2 km, nearest first
Homes near HRBR Layout
None of the new-launch or under-construction homes we list is within 2 km of HRBR Layout yet. The nearest stations below, or homes near every Namma Metro station.
The station
Line and status
- Blue LineUnder construction
- KR Puram – Hebbal (Phase 2B)Target December 2027Deccan Herald, 19 Aug 2026; status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
