Namma Metro · Pink Line
JP Nagar 4th Phase Metro Station: homes within 2 km
JP Nagar 4th Phase is on the Pink Line of Namma Metro in Bengaluru. The Pink Line here is built and at the safety inspection stage on the Kalena Agrahara – Tavarekere (elevated) stretch; target late Oct or early Nov 2026 (Reported, Vartha Bharati, 18 Oct 2026; status checked 20 October 2026). Within 2 km of the station we list 1 new-launch and under-construction project, from ₹9.54 Cr, and 1 ready-to-move.
Within 2 km, nearest first
1 new home near JP Nagar 4th Phase
| Project | Distance | From | Homes | Possession |
|---|---|---|---|---|
| BodhiSwan Realty · Jayanagar, South Bengaluru4 BHK · Mar 2028 | 1.4 km | ₹9.54 Cr | 4 BHK | Mar 2028 |
Ready-to-move homes within 2 km (1) are not listed here.
The station
Line and status
- Pink LineSafety inspection
- Kalena Agrahara – Tavarekere (elevated)Target Late Oct or early Nov 2026Reported, Vartha Bharati, 18 Oct 2026; status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
