Namma Metro · Yellow Line
Huskur Road Metro Station: homes within 2 km
Huskur Road is on the Yellow Line of Namma Metro in Bengaluru. The Yellow Line here has been open since 11 Aug 2025 (status checked 20 October 2026). Within 2 km of the station we list 1 new-launch and under-construction project, from ₹2.55 Cr, and 1 ready-to-move.
Within 2 km, nearest first
1 new home near Huskur Road
| Project | Distance | From | Homes | Possession |
|---|---|---|---|---|
| Purva SilverskyPuravankara · Hebbagodi, Huskur Road (near Electronic City)3 and 4 BHK · Jul 2030 | 0.8 km | ₹2.55 Cr | 3 and 4 BHK | Jul 2030 |
Ready-to-move homes within 2 km (1) are not listed here.
The station
Line and status
- Yellow LineOpen
- RV Road – BommasandraSince 11 Aug 2025Status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
