Property Point

Namma Metro · Yellow Line

Hongasandra Metro Station: homes within 2 km

Hongasandra is on the Yellow Line of Namma Metro in Bengaluru. The Yellow Line here has been open since 11 Aug 2025 (status checked 20 October 2026). Within 2 km of the station we list 2 new-launch and under-construction projects, from ₹3.1 Cr, and 2 ready-to-move.

Within 2 km, nearest first

2 new homes near Hongasandra

ProjectDistanceFrom
Purva HeritagePuravankara · Kudlu Gate, Hosur Road, South Bengaluru2 and 3 BHK · Aug 20301.2 km₹3.1 Cr
Purva MerakiPuravankara · HSR Layout3 and 4 BHK · Oct 20271.5 km₹3.9 Cr

Ready-to-move homes within 2 km (2) are not listed here.

The station

Line and status

Yellow LineOpen
RV Road – BommasandraSince 11 Aug 2025Status checked 20 October 2026

How we measured

Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.