The Bidadi metro is a PROPOSED extension of the Purple Line from Challaghatta along Mysuru Road beyond Kumbalgodu to Bidadi, about 15.6 km (OneIndia, 27 October 2026). Its feasibility study is complete, but that is not an approval: BMRCL says the Phase 4 routes are not finalised or approved (GoodReturns citing Moneycontrol, 27 October 2026). There is no DPR, cost, station list or date.
Updated 8 November 2026. We traced the line to its 2024 tender, checked what Mysuru Road commuters have today, and listed K-RERA projects in our catalogue near the Challaghatta end. For the township plan driving Bidadi interest, see Bidadi Township Latest News: Villages, Land, Nearby Prices.
Bidadi metro: the record so far
- Feb 2024 — BMRCL tendered a ₹1.59 crore feasibility study covering Challaghatta–Bidadi (15 km) with three other corridors (Public TV, 22 Jul 2024).
- Jul 2024 — tender finalised, a Hyderabad-based firm to do the study. Public TV reported the state had permitted extending the metro network to Ramanagara (22 Jul 2024).
- 27 Oct 2026 — listed in the proposed Phase 4 as about 15.6 km, feasibility study complete (OneIndia, 27 Oct 2026).
- Not yet — state approval of the study, DPR, cost sanction, funding, alignment, land notice.
What is NOT decided
Public TV noted in 2024 that a DPR would follow only if the state approved the feasibility report. We found no report of that approval. The stations, the exact path beyond Kumbalgodu, the depot and whether the line runs on the highway median are all open questions. Any 'Bidadi metro station' in a plot advertisement is not an official location.
What Mysuru Road has today
The Purple Line has run end to end from Whitefield (Kadugodi) to Challaghatta since 9 October 2023 (our station file, citing Wikipedia). Beyond Challaghatta, travel to Bidadi is by road. K-RERA projects near the Challaghatta end in our catalogue, with straight-line distance from our pin to the station:
- Provident Equinox — Provident Equinox, near the NICE Road junction, Kumbalgodu, K-RERA PRM/KA/RERA/1251/310/PR/180724/006944, 384 units, RERA completion 31 Mar 2028. About 2.0 km from Challaghatta.
- Casagrand Moondance — Casagrand Moondance, Kumbalgodu, K-RERA PRM/KA/RERA/1251/310/PR/200526/008667, 504 units, RERA completion 31 Dec 2029. Our pin is the Kumbalgodu locality centre, about 3.8 km from Challaghatta.
- Kengeri listings with an open Purple Line station closer at hand: Kengeri, Bangalore.
What to do now
- 1. If you work in the city, price Bidadi on road access plus a drive to Challaghatta, not on a metro.
- 2. For plots, confirm the layout approval and K-RERA registration on rera.karnataka.gov.in; a metro mention in a brochure is not an approval of anything.
- 3. Landowners near the highway between Kumbalgodu and Bidadi: no metro land notice exists. Keep RTC and mutation records current so you can respond quickly if one is issued.
- 4. Separate the township from the metro. Land acquisition news for the Bidadi township is a different process: Bidadi Township Latest News: Villages, Land, Nearby Prices.
- 5. Watch for state approval of the feasibility report and a DPR order. We will update this page when either appears.
